Module Outline
Date retreived
23/07/2026 10:15 AM AWST
23/07/2026 10:15 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install, modify and verify coaxial and structured communication copper cabling
Install, modify and verify coaxial and structured communication copper cabling
Module
National Code
NAT11297013
NAT11297013
State Code
BA379
BA379
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
16/01/2025
Field of Education
031309 - Communications Equipment Installation And Maintenance
Nominal Hours
4
Description
This unit specifies the skills and knowledge required to install, modify and verify coaxial and structured communication copper cabling in buildings and premises intended for connection to a telecommunications network as permitted by the Australian Communications and Media Authority (ACMA).
This unit is for holders of an Offshore Technical Skills Record (OTSR) or Australian Technical Competencies Statement (ATCS) issued by an RTO and incorporates the minimum context gap to meet Australian standards and regulations.
This unit shall only be undertaken by holders of an OTSR or ATCS for the following qualification or successor of the following qualification:
- UEE30820 Certificate III in Electrotechnology Electrician
This unit is for holders of an Offshore Technical Skills Record (OTSR) or Australian Technical Competencies Statement (ATCS) issued by an RTO and incorporates the minimum context gap to meet Australian standards and regulations.
This unit shall only be undertaken by holders of an OTSR or ATCS for the following qualification or successor of the following qualification:
- UEE30820 Certificate III in Electrotechnology Electrician
No information
No information
Elements and Performance Criteria
1. Prepare to install and/or modify copper cabling
- 1.1 Work Health and Safety (WHS) procedures for the given work area are obtained from work supervisor according to established procedures
- 1.2 Instruction in hazards and risk control measures for specific work functions and work areas are identified and obtained
- 1.3 Installation or modification of wiring is coordinated after consultation with relevant person/s affected by the work
- 1.4 The nature and location of the work is obtained from documentation including layout and wiring diagrams or from work supervisor to establish the scope of work to be undertaken
- 1.5 Cable routes are planned within the constraints of the building structure, significant and regulations
- 1.6 Sources of components/materials required for the work are obtained in accordance with established routines and procedures
- 1.7 Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety
- 1.8 Preparatory work is checked to ensure compliance with regulations, workplace procedures, safety and job requirements
2. Install or modify copper cables
- 2.1 Established WHS risk control measures and procedures for carrying out the work are followed
- 2.2 Structured cables are installed or modified with sufficient excess to affect terminations in accordance with manufacturer specifications, technical standards and job requirements
- 2.3 Cabling is installed efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services
3. Terminate and test copper cables
- 3.1 Established WHS risk control measures and procedures for carrying out the work are followed
- 3.2 Cable termination work area is cleaned and safety measures implemented
- 3.3 Cables are prepared for termination in accordance with manufacturer specifications, technical standards and workplace procedures
- 3.4 Surge suppression devices are fitted to cables with metallic components in accordance with manufacturer specifications, technical industry standards and workplace procedures
- 3.5 Cable shields are earthed in accordance with manufacturer specifications, technical standards and workplace procedures
- 3.6 Twist ratio of generic, structured metallic cables is maintained in accordance with manufacturer specifications and technical standards
- 3.7 Twisted pair cables are terminated in accordance with manufacturer specifications, technical standards and workplace procedures
- 3.8 Cable performance tests are conducted accurately and results documented in accordance with workplace procedures
- 3.9 Cause of defects indicated by inspection and test results are identified and rectified in accordance with manufacturer specifications, technical industry standards and workplace procedures
- 3.10 Regular quality checks of the installed wiring are undertaken in accordance with workplace procedures
- 3.11 Cabling is terminated efficiently without waste of materials and energy or damage to apparatus, the surrounding environment or services
4. Verify and document copper cabling installation and performance
- 4.1 WHS work completion risk-control measures and procedures are followed
- 4.2 Work site is cleaned and made safe in accordance with established procedures
- 4.3 Final checks are made to install cabling to ensure it conforms to performance requirements and regulations
- 4.4 Telecommunications cabling advice (TCA) forms are completed in accordance with workplace procedures and issued to relevant person/s
No information
Associated Qual/Courses
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGZ07 | 11297NAT | Course in Electrician - Minimum Australian Context Gap | Accredited course |