Module Outline
Date retreived
22/07/2026 8:59 PM AWST
22/07/2026 8:59 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply Australian Earthing Systems and requirements
Apply Australian Earthing Systems and requirements
Module
National Code
ECGELE003A
ECGELE003A
State Code
AW872
AW872
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
08/02/2016
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Nominal Hours
20
Description
This unit is for holders of OTSR issued by an RTO and incorporated the minimum context gap to meet Australian standards and regulations.
No information
Evidence Guide
Elements describe the essential outcomes of the unit
Performance criteria describe the performance needed to demonstrate achievement of the element.
1. Prepare to solve low voltage a.c. circuit problems.
1.1 WHS/OH&S procedures for a given work area are identified, obtained and understood.
1.2 Established WHS/OH&S risk control measures and procedures in preparation for the work are followed.
1.3 Safety hazards, which have not previously been identified, are noted and established risk control measures are implemented.
1.4 The nature of the circuit(s) problem is obtained from documentation or from work supervisor to establish the scope of work to be undertaken.
1.5 Advice is sought from the work supervisor to ensure the work is coordinated effectively with others.
1.6 Sources of materials that may be required for the work are established in accordance with established procedures.
1.7 Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
2. Solve low voltage a.c. circuit problems.
2.1 WHS/OH&S risk control measures and procedures for carrying out the work are followed.
2.2 The need to test or measure live is determined in strict accordance with WHS/OH&S requirements and when necessary conducted within established safety procedures.
2.3 Circuits/machines/plant are checked as being isolated where necessary in strict accordance WHS/OH&S requirements and procedures.
2.4 Established methods are used to solve circuit problems from measure and calculated values as they apply to single and three phase low voltage circuit.
2.5 Unexpected situations are dealt with safely and with the approval of an authorised person.
2.6 Problems are solved without damage to apparatus, circuits, the surrounding environment or services and using sustainable energy practices.
3. Complete work and document problem solving activities.
3.1 WHS/OH&S work completion risk control measures and procedures are followed.
3.2 Work site is cleaned and made safe in accordance with established procedures.
3.3 Justification for solutions used to solve circuit problems is documented.
3.4 Work completion is documented and an appropriate person or persons notified in accordance with established procedures.
Performance criteria describe the performance needed to demonstrate achievement of the element.
1. Prepare to solve low voltage a.c. circuit problems.
1.1 WHS/OH&S procedures for a given work area are identified, obtained and understood.
1.2 Established WHS/OH&S risk control measures and procedures in preparation for the work are followed.
1.3 Safety hazards, which have not previously been identified, are noted and established risk control measures are implemented.
1.4 The nature of the circuit(s) problem is obtained from documentation or from work supervisor to establish the scope of work to be undertaken.
1.5 Advice is sought from the work supervisor to ensure the work is coordinated effectively with others.
1.6 Sources of materials that may be required for the work are established in accordance with established procedures.
1.7 Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety.
2. Solve low voltage a.c. circuit problems.
2.1 WHS/OH&S risk control measures and procedures for carrying out the work are followed.
2.2 The need to test or measure live is determined in strict accordance with WHS/OH&S requirements and when necessary conducted within established safety procedures.
2.3 Circuits/machines/plant are checked as being isolated where necessary in strict accordance WHS/OH&S requirements and procedures.
2.4 Established methods are used to solve circuit problems from measure and calculated values as they apply to single and three phase low voltage circuit.
2.5 Unexpected situations are dealt with safely and with the approval of an authorised person.
2.6 Problems are solved without damage to apparatus, circuits, the surrounding environment or services and using sustainable energy practices.
3. Complete work and document problem solving activities.
3.1 WHS/OH&S work completion risk control measures and procedures are followed.
3.2 Work site is cleaned and made safe in accordance with established procedures.
3.3 Justification for solutions used to solve circuit problems is documented.
3.4 Work completion is documented and an appropriate person or persons notified in accordance with established procedures.
Elements and Performance Criteria
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| 75982 | EEOZAMCG05A | Apply Australian Standards to multiple earth neutral (MEN) wiring circuits/systems - AMCG | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AY779 | NAT10809003 | Apply Australian standards and requirements to solve LV a.c. circuits/systems problems | Module |
Associated Qual/Courses
| State Code | National Code | Title | Type |
|---|---|---|---|
| YU04 | 10145NAT | Course in Electrician - Minimum Australian Context Gap | Accredited course |