Module Outline
Date retreived
22/07/2026 11:32 AM AWST
22/07/2026 11:32 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Undertake an integrated technology project
Undertake an integrated technology project
Module
National Code
VU23853
VU23853
State Code
BB574
BB574
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
21/10/2025
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Nominal Hours
60
Description
This unit describes the performance outcomes, skills and knowledge required to carry out an integrated technology project by merging distinct technology domains to achieve an innovative and integrated technical outcome.
It requires the ability to decide the technology options, plan, prepare and implement a project, in accordance with a project management plan. The use of appropriate mathematical techniques is required to determine system parameters.
This unit of competency applies to a person working in an environment where merging technologies are utilised for innovative technical applications.
No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.
It requires the ability to decide the technology options, plan, prepare and implement a project, in accordance with a project management plan. The use of appropriate mathematical techniques is required to determine system parameters.
This unit of competency applies to a person working in an environment where merging technologies are utilised for innovative technical applications.
No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.
No information
No information
Elements and Performance Criteria
Prepare for an integrated technology project
- 1.1 Integrated technology options and the scope of the desired project outcomes are considered and discussed with the appropriate personnel
- 1.2 Project brief outlining the expected project outcomes is prepared and approved by appropriate personnel
- 1.3 Project stakeholders directly involved or other stakeholders who are affected by the project are consulted to ensure the work is coordinated and the impact of the planned work is minimised
- 1.4 Relevant occupational health and safety (OHS) requirements and risk control measures are clarified
- 1.5 An integrated technology project workplan is prepared and approved by the appropriate personnel
- 1.6 Resources and equipment needed for the project are obtained in accordance with enterprise procedures and checked for correct specifications and operation
Instigate the integrated technology project
- 2.1 Plant or machine circuits are checked as being isolated where necessary in accordance with OHS requirements and procedures
- 2.2 Project activities are undertaken in accordance with the project workplan and within specified timelines
- 2.3 Appropriate mathematical processes are used to calculate and monitor the project variables
- 2.4 Project progress is regularly reviewed against project workplan and discussed with appropriate personnel
- 2.5 Decisions for addressing unexpected situations are made after discussion with the appropriate person, consideration of the job specifications, safety and compliance procedures
- 2.6 Network interactivity cycle is tested and evaluated to ensure connectivity, control and integration of different technologies
- 2.7 Relevant occupational health and safety (OHS) requirements and risk control measures are implemented
Complete and document project outcomes
- 3.1 Key outputs of the integrated technology project are measured, calculated and/or charted to confirm compliance with the specifications
- 3.2 Final project outcomes are reviewed against specifications and intended objectives
- 3.3 Equipment and tools used in the project are checked and stored in accordance with enterprise procedures
- 3.4 A clear and concise project report is prepared in accordance with enterprise procedures
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AY797 | VU22746 | Undertake an integrated technology project | Unit of competency |
Associated Qual/Courses
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHE71 | 22697VIC | Certificate IV in Integrated Technologies | Accredited course |