Qualification Outline
Date retreived
22/07/2026 4:27 AM AWST
22/07/2026 4:27 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate III in Fire Protection
Certificate III in Fire Protection
Qualification
National Code:
BCP30503
BCP30503
State Code:
W074
W074
TGA Status:
Deleted
Deleted
DTWD Status:
Replaced
Replaced
National Endorsed, State Implementation and Classification
Field of Education
0403 - Building
Original TGA Release Date
02/02/2009
Approved Date
09/11/2005
Stream of Study
Initial Vocational (3100 - 3600)
VET Act Classifier
A
Nominal Hours
760
Duration
6 Semesters
Current Release Number
1.00
Current Release Date
02/02/2009
VET Act Conditions
—
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 1.00 | 02/02/2009 | Current | Approved |
Description
Schedule
1.
CORE
The following units of competence must be achieved.
2.
ELECTIVES
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W1353 | BCGCO2003B | Carry out concreting to simple forms | 24 | Unit of competency |
| W2722 | BCPCM3001A | Flash penetrations through roofs and walls | 34 | Unit of competency |
| W2726 | BCPFS2002A | Install portable fire equipment | 12 | Unit of competency |
| W1937 | BCPRF2001A | Work safely on roofs | 20 | Unit of competency |
3.
Other ELECTIVE units of competence that may be considered as an alternative to the Group 02 electives.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| N0360 | BCF2009A | Carry out load slinging of off-site materials | 4 | Unit of competency |
| W1820 | BCGCM2008B | Erect and dismantle restricted height scaffolding | 16 | Unit of competency |
| W1917 | BCGWC3006B | Install acoustic and thermal environmental protection systems | 20 | Unit of competency |
| W1352 | BCGCM2003B | Install trench support | 18 | Unit of competency |
| W2723 | BCPDR3004A | Install water mains pipe systems | 72 | Unit of competency |
| W1865 | BCGRI3001B | Operate personnel and materials hoists | 24 | Unit of competency |
| M1772 | MEM5.50AA | Perform routine gas metal arc welding | 18 | Unit of competency |
| W0822 | MEM5.49AB | Perform routine gas tungsten arc welding | 18 | Unit of competency |
| W1264 | BCPCM3002A | Weld polyethylene (PE) pipe using fusion method | 8 | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| W604 | CPC32808 | Certificate III in Fire Protection | Qualification |
VET Info Notes
This training program is a representation of the qualification code BCP30503 taken from the Plumbing and Services Industry Training Package BCP03 which should be consulted for full description of requirements. BCP30503 is endorsed until 30 November 2006.
1. This qualification is the copyright of The Australian National Training Authority.
2. Further information on this qualification is contained in the training Package available from Australian Training Products Ltd., Tel: (03) 9630 9836.
3. This qualification was entered on to the STARS by the METS CSSN (TAFEWA Swan) on 14 September 2005.
4. This qualification nominal hours was amended on 30 January 2006.
1. This qualification is the copyright of The Australian National Training Authority.
2. Further information on this qualification is contained in the training Package available from Australian Training Products Ltd., Tel: (03) 9630 9836.
3. This qualification was entered on to the STARS by the METS CSSN (TAFEWA Swan) on 14 September 2005.
4. This qualification nominal hours was amended on 30 January 2006.
Entry Requirements
No information
Traineeships and Apprenticeships
(AP00900) SPRINKLER FITTING
Apprenticeship