Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage the application and monitoring of energy conservation and management practices and processes
Manage the application and monitoring of energy conservation and management practices and processes
Unit of competency
National Code
CPCCBC5012A
CPCCBC5012A
State Code
W9299
W9299
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040303 - Building Construction Management
Original Release Date
20/06/2014
Nominal Hours
100
Description
This unit of competency specifies the outcomes required to manage the application and monitoring of energy conservation and management practices and processes within the building and construction industry. Successful application of the unit requires knowledge of energy management practices and methodologies, statistical analysis, current trends and factors in energy conservation, and legislative and regulatory requirements.
Notes
Elements and Performance Criteria
1. Prepare an energy conservation and management plan for the organisation.
- 1.1. Organisational policy and operational guidelines for energy conservation and management are reviewed.
- 1.2. Best practice and benchmarking methods are used to determine current energy conservation and management performance.
- 1.3. Opportunities for energy conservation and savings are identified within the immediate work area and on project sites.
- 1.4. Staff and contractors are asked for ideas and suggestions concerning organisational energy conservation.
- 1.5. Energy conservation and management plan is prepared on the basis of available information.
- 1.6. Advice is sought from senior management, as required, concerning implementation of the plan.
2. Manage the energy conservation and management plan.
- 2.1. Staff and contractors are informed of their obligations in implementing the energy conservation and management plan and are monitored for compliance.
- 2.2. Energy data-gathering systems are evaluated, changes are made as necessary, and system is managed for maximum efficiency and accuracy.
- 2.3. New projects are evaluated to determine their impact on existing energy conservation planning obligations.
- 2.4. Participation by contractors in the achievement of plan's objectives is encouraged and monitored.
- 2.5. Difficulties, obstructions or factors that impact on the achievement of the energy conservation plan are identified and measures are taken to address them.
- 2.6. Information concerning updates to the plan is communicated to staff and stakeholders.
- 2.7. Environmental management plan evaluation strategy is developed and managed to ensure that organisational objectives are achieved.
3. Monitor the energy conservation and management plan to ensure organisational objectives are being met.
- 3.1. Organisational feedback systems are implemented and managed to assist with compliance with and management of the plan.
- 3.2. Regular feedback is obtained from staff and contractors concerning the efficiency of the operations of the energy conservation and management plan.
- 3.3. Energy savings are identified and promoted throughout the organisation.
- 3.4. Energy wastage is reported and strategies are implemented as necessary to assist with compliance with the energy management plan.
4. Evaluate and recommend changes to the energy conservation and management plan.
- 4.1. Energy conservation and management plan is reviewed to identify areas needing improvement and action is taken.
- 4.2. Measures are introduced to encourage staff to suggest more efficient procedures and innovations to improve the performance of the energy conservation and management plan.
- 4.3. Plans are redrafted to include improvements or address deficiencies identified during monitoring.
- 4.4. Revised plans are submitted to senior management for endorsement and procedures are amended accordingly.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Best practice and benchmarking methods include:
comparisons of current, previously established and external energy conservation and management plans
costs associated with optimum environmental conformance
formally or informally prepared performance indicators against energy management objectives
performance measurements against industry, local authority, regulatory or world standards
specific energy targets, including electrical power usage and fuel usage, heat loss and thermal efficiency
statistical record keeping, using at start, ongoing and at conclusion measurements.
Energy conservation and management plan includes:
formally or informally gathered information concerning energy issues and requirements
key people to be consulted or included in decision making
specific forms of activity to be pursued or which are subject to monitoring or evaluation
timeframes and key energy conservation benchmarks to be achieved.
Energy data-gathering systems include:
formal and informal reports from employees and contractors
reports from supply organisations
scheduled energy conservation management meetings and briefings
conformance reporting on achievement of milestones or performance targets
statistical and analytical data in support of energy management objectives.
Feedback system includes:
feedback from supply authorities
formal and informal information gathering from employees and contractors
specifically documented processes using formal reporting arrangements
spot checks on aspects of the energy management process.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Best practice and benchmarking methods include:
comparisons of current, previously established and external energy conservation and management plans
costs associated with optimum environmental conformance
formally or informally prepared performance indicators against energy management objectives
performance measurements against industry, local authority, regulatory or world standards
specific energy targets, including electrical power usage and fuel usage, heat loss and thermal efficiency
statistical record keeping, using at start, ongoing and at conclusion measurements.
Energy conservation and management plan includes:
formally or informally gathered information concerning energy issues and requirements
key people to be consulted or included in decision making
specific forms of activity to be pursued or which are subject to monitoring or evaluation
timeframes and key energy conservation benchmarks to be achieved.
Energy data-gathering systems include:
formal and informal reports from employees and contractors
reports from supply organisations
scheduled energy conservation management meetings and briefings
conformance reporting on achievement of milestones or performance targets
statistical and analytical data in support of energy management objectives.
Feedback system includes:
feedback from supply authorities
formal and informal information gathering from employees and contractors
specifically documented processes using formal reporting arrangements
spot checks on aspects of the energy management process.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by effective management of the application and monitoring of energy conservation and management practices and processes on medium rise building and construction projects.
This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
develop effective energy conservation and management action plans and strategies
assess extent of effective energy management advice provided to the organisation
determine effectiveness and efficiency of the energy conservation and management recording and reporting systems and preparation of documentation to organisational standards
implement effective processes to manage improvements to organisational energy conservation and management practices and reduce the non-conforming practices
research current trends in energy conservation and management
conform to relevant legislative, regulatory and organisational requirements.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
documentation that should normally be available in a building or construction office
relevant codes, standards and regulations
office equipment, including calculators, photocopiers and telephone systems
computers with appropriate software to view 2-D CAD drawings, run costing programs and print copies
a technical reference library with current publications on measurement, design, building construction and manufacturers' product literature
a suitable work area appropriate to the construction process.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by effective management of the application and monitoring of energy conservation and management practices and processes on medium rise building and construction projects.
This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
develop effective energy conservation and management action plans and strategies
assess extent of effective energy management advice provided to the organisation
determine effectiveness and efficiency of the energy conservation and management recording and reporting systems and preparation of documentation to organisational standards
implement effective processes to manage improvements to organisational energy conservation and management practices and reduce the non-conforming practices
research current trends in energy conservation and management
conform to relevant legislative, regulatory and organisational requirements.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
documentation that should normally be available in a building or construction office
relevant codes, standards and regulations
office equipment, including calculators, photocopiers and telephone systems
computers with appropriate software to view 2-D CAD drawings, run costing programs and print copies
a technical reference library with current publications on measurement, design, building construction and manufacturers' product literature
a suitable work area appropriate to the construction process.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCQ13 | CPCCBC5012 | Manage the application and monitoring of energy conservation and management practices and processes | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W741 | CPC50210 | Diploma of Building and Construction (Building) | Qualification |
| W616 | CPC50308 | Diploma of Building and Construction (Management) | Qualification |