Unit of competency Outline

Date retreived
23/07/2026 5:48 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Monitor complex engineering surveying structures

Monitor complex engineering surveying structures

Unit of competency
National Code
CPPSIS6036A
State Code
WE835
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
27/11/2012
State Implementation and Classification
Approved Date
25/10/2013
Field of Education
031101 - Surveying
Original Release Date
25/10/2013
Nominal Hours
120
Description
This unit of competency specifies the outcomes required to observe, monitor and process observation data for complex engineering surveying structures. It requires the ability to demonstrate highly specialised technical skills and to plan and execute project activity according to job specifications. Functions will entail complying with, and developing or amending, organisational guidelines.
Notes
Elements and Performance Criteria
1 Organise project resources.
  • 1.1 Characteristics of the operating environment and any special equipment or resource requirements are identified according to organisational guidelines.
  • 1.2 Details of technology and techniques to be used to collect data are noted in project specifications.
  • 1.3 Equipment is checked to be in good working order.
  • 1.4 Manufacturer specifications with regard to the use of equipment are complied with.
2 Develop the project plan.
  • 2.1 Project objectives, deliverables, constraints and principal work activities are defined and documented according to written spatial data specifications and client requirements.
  • 2.2 Information is included in the plan relating to identified risks and contingencies, resources, technology details and techniques to be used to collect data in the specified format.
  • 2.3 Information on the validation process is specified in the plan to verify the integrity of required spatial data.
  • 2.4 Design is interpreted to identify surveying data components to be controlled or monitored.
  • 2.5 Hazards and risks in the work site are identified according to organisational guidelines and OHS and legislative requirements.
  • 2.6 Pertinent legal and statutorystandards are considered and adhered to.
  • 2.7 Organisation of appropriate resources, equipment, materials and transport required for the project is designated to relevant personnel.
3 Manage the project.
  • 3.1 Identified spatial components are measured.
  • 3.2 Measured spatial data is reduced to a project spatial reference system for comparison with design.
  • 3.3 Measurements are validated, recorded and processed according to project specifications.
  • 3.4 Work is scheduled to be completed within timeavailable.
  • 3.5 Work is allocated to appropriate personnel and supervisory processes, checks and measures are implemented.
4 Monitor the project.
  • 4.1 Project management mechanisms are implemented to measure, record and report progress of activities in relation to agreed schedule and plans.
  • 4.2 Contingencies and constraints are managed to ensure project meets specifications.
  • 4.3 Progress is reviewed throughout the project life cycle, with agreed changes implemented to ensure consistency with client needs, project scope, objectives and constraints.
  • 4.4 Quality assurance processes are implemented based on the project plan.
5 Complete the project.
  • 5.1 Completed work is checked against specifications.
  • 5.2 Required documentation is completed according to organisational guidelines.
  • 5.3 Relevant personnel and project team are informed of results according to organisational guidelines.
  • 5.4 Spatial data is archived according to project specifications.
6 Review the project.
  • 6.1 Project is reviewed against objectives.
  • 6.2 Project review findings are reported to stakeholders.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the performance criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Operating environment:
may be any surveying project work site.
Organisational guidelines may include:
appropriate timelines
code of ethics
company policy
final product formats
formal design parameters
legislation relevant to the work or service function
manuals
OHS policies and procedures
personnel practices and guidelines outlining teamwork, work roles and responsibilities
requirements for data processing.
Techniques may include:
indoor
outdoor
special operating methods to suit legislative or industry requirements.
Project specifications may include:
operational goals
agreed client requirements
short or long-term organisational functions
written survey specifications.
Equipment may include:
any equipment required for survey project, including:
computer-aided design (CAD)
current meter
echo sounder
global navigation satellite system (GNSS)
laser technologies
level
photogrammetry
remote sensing
theodolite
tide gauge
total station.
Manufacturer specifications may include:
equipment specifications
operator manuals.
Constraints may include:
coverage
datum
environmental factors
industry requirements
legal and statutory
financial
resource availability
time.
Principal work activities may include the survey design of:
bridge construction
building construction (domestic and commercial)
railway construction
road construction
sewerage systems
stormwater systems.
Specifications may include:
detailed technical descriptions of survey data and its requirements
preparation of cross-sections and plans with all information included.
Client requirements refer to description of outputs and may be contained in:
contracts
memos
tender briefs
verbal instructions
written instructions.
Contingencies may include:
equipment failure
injury to personnel
personnel turnover
observation errors
obstructions to engineering activity
weather.
Design may include:
digital information
hard copy plans
maps
written instructions.
Surveying data components may include:
depth
dimension
direction
flow rates
position
slope.
Hazards may include:
broken glass and other sharp surfaces
damaged or inappropriate equipment
dust and fibres
electrical problems arising from cables, electrical fittings (switches and lights) and untested electrical equipment
environmental impact
extremes of heat and temperature
fatigue
fire
gas
heights
awkward and repetitive postures
mobile vehicle problems around plant and vehicles
moving and unguarded machinery and equipment
noise
occupational violence and bullying
poor manual handling techniques
poor personal hygiene practices
repetitive motion, force and vibration
syringes or other sharp objects
ultraviolet light
underfoot conditions e.g. slippery, uneven and rough surfaces
unrestricted people access
work in isolated and remote environments.
OHS may include:
Australian standards
development of site safety plan
identification of potential hazards
inspection of work sites
training staff in OHS requirements
use of personal protective clothing
use of safety equipment and signage.
Legislative requirements may include:
Australian standards
award and enterprise agreements
certification requirements
codes of practice
quality assurance requirements.
Legal and statutory standards may include:
local government requirements
national standards
state statutes and regulations.
Relevant personnel may include:
colleagues
registered surveyors
site personnel
staff or employee representatives
supervisors or line managers
suppliers
users.
Measurements may include use of:
equipment required for survey project
GNSS
level
tape
total station.
Supervisory process may include:
planning
targeting
delegating
implementing
monitoring
overseeing practices
finalising activity
review.
Project management mechanisms may include:
communication with stakeholders
dispute resolution guidelines
monitoring and adjusting key milestones
progress reports.
Client may include:
customers with routine or special requests
external to organisation
internal to organisation
regular and new customers, including:
business enterprises
government agencies
members of the public
suppliers.
Quality assurance processes may be internal and external and include:
product or service measurement against set criteria
standard verification
target monitoring.
Required documentation may include:
electronic or paper-based correspondence with client
field records
final report
records of conversation
survey plots
organisational work activity sheets.
Stakeholders may include:
human resource personnel: internal or external
procurement agency: internal or external management.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the Assessment Guidelines for this Training Package.
Overview of assessment
This unit of competency could be assessed on its own or in combination with other units relevant to the job function, for example CPPSIS6032A Conduct an advanced GNSS control survey, and CPPSIS6035A Conduct complex engineering set out surveys.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
accessing and interpreting design information to identify the components to be measured and monitored
documenting and reporting
managing a team
performing measurements
planning resources
reducing and manipulating survey data
recording and reporting non-conformity aspects
knowledge of engineering-related tasks and associated computation.
Specific resources for assessment
Resource implications for assessment include access to:
assessment instruments, including personal planner and assessment record book
assignment instructions, work plans and schedules, policy documents and duty statements
registered training provider of assessment services
relevant guidelines, regulations and codes of practice
suitable venue and equipment.
Access must be provided to appropriate learning and assessment support when required.
Where applicable, physical resources should include equipment modified for people with disabilities.
Context of assessment
Holistic: based on the performance criteria, evidence guide, range statement, and required skills and knowledge.
Method of assessment
Demonstrated over a period of time and observed by the assessor (or assessment team working together to conduct the assessment).
Demonstrated competency in a range of situations, that may include customer/workplace interruptions and involvement in related activities normally experienced in the workplace.
Obtained by observing activities in the field and reviewing induction information. If this is not practicable, observation in realistic simulated environments may be substituted.
Guidance information for assessment
Assessment requires that the clients’ objectives and industry expectations are met. If the clients’ objectives are narrowly defined or not representative of industry needs, it may be necessary to refer to portfolio case studies of a variety of surveying and spatial information services requirements to assess competency.
Oral questioning or written assessment and hypothetical situations (scenarios) may be used to assess underpinning knowledge (in assessment situations where the candidate is offered a preference between oral questioning or written assessment, questions are to be identical).
Supplementary evidence may be obtained from relevant authenticated correspondence from existing supervisors, team leaders or specialist training staff.
All practical demonstration must adhere to the safety and environmental regulations relevant to each State or Territory.
Where assessment is for the purpose of recognition (recognition of current competencies [RCC] or recognition of prior learning [RPL]), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time.
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge.
Assessment processes will be appropriate to the language and literacy levels of the candidate and any cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
Replaces
State Code National Code Title Type
D1555 CPPSIS6016A Monitor complex engineering surveying structures Unit of competency
Replaced By
State Code National Code Title Type
AXI71 CPPSIS6036 Monitor engineering structures Unit of competency
State Code National Code Title Type
J360 CPP60312 Advanced Diploma of Surveying Qualification