Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct cane weighbridge operations
Conduct cane weighbridge operations
Unit of competency
National Code
FDFSUG207A
FDFSUG207A
State Code
WD837
WD837
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/07/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
31/07/2014
Nominal Hours
25
Description
This unit describes the outcomes required to operate a weighbridge to weigh and record incoming cane deliveries.
Notes
Elements and Performance Criteria
1 Set up weighbridge operations
- 1.1 Weighbridge systems, including equipment, computer and recording arrangements are checked for operational status
- 1.2 Tests to confirm accuracy of weighbridge operations and related functions are conducted in accordance with enterprise procedures, manufacturer’s instructions and relevant legislation
- 1.3 Accurate reporting of the results of the inspection and testing is kept in accordance with statutory requirements, enterprise policy and industry guidelines
- 1.4 Faults/discrepancies in weighbridge operation and Hazards are identified and action undertaken in accordance with enterprise procedures
2 Weigh loaded vehicles/bins
- 2.1 Bins exceeding weight limit are rejected
- 2.2 Weight of loaded bins\vehicles is registered against bin identification
- 2.3 Net weight of bins\vehicles is calculated
- 2.4 Bins\vehicles and cane type are recorded according to workplace recording requirements
- 2.5 The workplace meets housekeeping standards
3 Prepare for shift changeover
- 3.1 Weighbridge systems, including equipment, computer and recording arrangements are secured or made ready for the next shift
- 3.2 Records of operations are maintained and filed in accordance with enterprise procedures and statutory requirements
- 3.3 Shift changeover is carried out according to workplace procedure
- 3.4 Incoming weighbridge operators are aware of weighbridge and related equipment status procedures and manufacturer's recommendations
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
Standard Operating Procedures (SOPs)
manufacturer's specifications.
Information systems
Information systems may be print or screen based.
Weighbridge calibration
Calibration of weighbridges is determined using test weights.
Teamwork
Work may require the ability to work within a team environment.
Communication methods
Communication methods may include use of two-way radios.
Policies and procedures
Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements.
Codes of Practice
Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations.
Workplace information
Workplace information can include:
Standard Operating Procedures (SOPs)
manufacturer's specifications.
Information systems
Information systems may be print or screen based.
Weighbridge calibration
Calibration of weighbridges is determined using test weights.
Teamwork
Work may require the ability to work within a team environment.
Communication methods
Communication methods may include use of two-way radios.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
confirm status of weighbridge and related equipment at start up
demonstrate load weighing procedure
liaise with pushers and pin-pullers as required
complete weighbridge operation records.
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Weighbridge and related equipment
Relevant codes of practice and industry standards
Operating procedures and related advice on equipment operation
Loaded cane bins
Personal protective clothing and equipment
Communication systems and equipment
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures.
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit. Where the weighbridge operator conducts yard control and/or tipping operations, the following related units are to be co-assessed with this unit.
SUG222A Operate a tipping station
SUG101A Move cane bins in a marshalling yard.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Overview of assessment
Assessment must be carried out in a manner that recognises the cultural and literacy requirements of the assessee and is appropriate to the work performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of ability to:
confirm status of weighbridge and related equipment at start up
demonstrate load weighing procedure
liaise with pushers and pin-pullers as required
complete weighbridge operation records.
Context of and specific resources for assessment
Assessment must occur in a real or simulated workplace where the assessee has access to:
Weighbridge and related equipment
Relevant codes of practice and industry standards
Operating procedures and related advice on equipment operation
Loaded cane bins
Personal protective clothing and equipment
Communication systems and equipment
Housekeeping standards and procedures
Workplace information recording systems, requirements and procedures.
Method of assessment
Other units of competency relevant to the work role should be assessed in conjunction with this unit. Where the weighbridge operator conducts yard control and/or tipping operations, the following related units are to be co-assessed with this unit.
SUG222A Operate a tipping station
SUG101A Move cane bins in a marshalling yard.
Guidance information for assessment
To ensure consistency in one's performance, competency should be demonstrated on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and where possible, over a number of assessment activities.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYL34 | SUGTCW2A | Conduct cane weighbridge operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAM80 | FBPSUG2007 | Conduct cane weighbridge operations | Unit of competency |