Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Erect power systems transmission structure hardware

Erect power systems transmission structure hardware

Unit of competency
National Code
UETDRTO001
State Code
ODN65
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/09/2021
State Implementation and Classification
Approved Date
21/12/2021
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
21/12/2021
Nominal Hours
54
Description
This unit covers the erection of hardware and/or associated equipment used on transmission towers. It includes the correct positioning of hardware on the towers in accordance with construction plans and specifications. It also encompasses the inspection and confirmation that the hardware and associated equipment are in accordance with the works order and the identification of potential hazards and safety risks with recommendations for preventative action being referred to appropriate authorities.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to erect transmission tower hardware
  • 1.1 Work instructions are received and confirmed
  • 1.2 Relevant requirements and established procedures to be followed for the work to be performed are discussed with all personnel to establish and confirm the work schedule
  • 1.3 Work health and safety (WHS)/occupational health and safety (OHS) policies and procedures to be followed for the work to be performed are received and confirmed
  • 1.4 Suggestions to assist in meeting the erection of transmission tower hardware outcomes are made to others involved in the work
  • 1.5 Hazards are identified, WHS/OHS risks assessed and emergency exits kept clear according to given instructions and established procedures
  • 1.6 Scope of responsibility under the relevant work permit are received and confirmed with relevant personnel according to requirements and established procedures
  • 1.7 Resources, including, equipment, tools and personnel protective equipment (PPE), required for the job are obtained and, in working order according to established procedures
  • 1.8 Relevant responsibility associated with first aid, tower/pole top rescue and/or other related work safety procedures at the worksite are confirmed in accordance with requirements and established procedures to ensure safety measures are followed in the instance of an incident
  • 1.9 Client issues are referred to appropriate personnel in accordance with industry/community standards
  • 1.10 Site is prepared according to given instructions and the work schedule for a quality outcome and to minimise risk and damage to property, commerce and individuals in accordance and established procedures
  • 1.11 Road signs, barriers and warning devices are positioned in accordance with given instructions and requirements
2 Carry out the erection of transmission tower hardware
  • 2.1 WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are followed in accordance with given instructions, requirements and/or established procedures
  • 2.2 Lifting, climbing, working in confined spaces and/or aloft, and use of power tools/equipment, techniques and practices are safely followed in accordance with given instructions and according to requirements to eliminate the prospects of incidents
  • 2.3 Operational knowledge for the erection of transmission tower hardware to be applied to the work is confirmed to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements and established procedures
  • 2.4 The erection of transmission tower hardware is carried out in accordance with given instructions and established routines/procedures
  • 2.5 Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks reported to immediate authorised personnel for directions according to established procedures
  • 2.6 Non-routine events are referred to immediate authorised personnel for directions according to established procedures
  • 2.7 Problems associated with the erection of transmission tower hardware are dealt with using acquired known solutions and skills related to routine procedures to ensure work instructions and established procedures are met
  • 2.8 Ongoing checks of quality of the work are undertaken in accordance with given instructions and established procedures
3 Complete the erection of transmission tower hardware
  • 3.1 Work undertaken is checked against work schedule and anomalies reported to authorised personnel in accordance with established procedures
  • 3.2 Accidents and/or incidents are actioned and reported to authorised personnel in accordance with established procedures
  • 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with given instructions and established procedures
  • 3.4 Tools, equipment and any surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with established procedures
  • 3.5 Appropriate personnel are notified of work completion according to established procedures
  • 3.6 Work completion records and report forms/data sheets are completed accurately in accordance with given instructions and established procedures
No information
No information
Replaces
State Code National Code Title Type
OBG69 UETTDRTP24 Erect power systems transmission structure hardware Unit of competency
Replaced By
State Code National Code Title Type
ODZ77 UETDRTO016 Install transmission structure hardware Unit of competency
State Code National Code Title Type
BHC0 UET20421 Certificate II in Transmission Structure and Line Assembly Qualification