Unit of competency Outline
Date retreived
22/07/2026 6:44 AM AWST
22/07/2026 6:44 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct aluminium roll-up style awnings
Construct aluminium roll-up style awnings
Unit of competency
National Code
MSFBA2010
MSFBA2010
State Code
WI261
WI261
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/06/2014
Nominal Hours
56
Description
This unit of competency covers constructing aluminium roll-up style awnings. The unit applies in a workplace environment and may be conducted in small to large scale enterprises.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare work
- 1.1 Work health and safety (WHS) requirements, legislative requirements and workplace practices are observed throughout the work
- 1.2 Personal protective equipment is selected and used
- 1.3 Work orders are checked and confirmed
- 1.4 Tools and equipment are selected and checked for safe operation
- 1.5 Aluminium stock and hardware are selected and checked against work requirements.
2 Cut materials ready for assembly
- 2.1 Head box, roller and bottom rail are cut
- 2.2 Spring is selected according to manufacturer specifications
- 2.3 Aluminium panels are cut
- 2.4 Measurements are checked against work order
3 Construct awning
- 3.1 Aluminium panels are joined to form awning skin
- 3.2 Roller and bottom rail are installed to skin
- 3.3 Spring and pin end are fitted to roller
- 3.4 End caps and pull ring are installed to bottom rail
4 Make quality checks
- 4.1 Completed awnings are checked ensuring finished product matches work order
- 4.2 Finished blind is tested within limits of correct operation for correct operation and parts of the work that do not comply with work order are repaired or re-worked
5 Complete work
- 5.1 Arms and fittings are selected ready for installation
- 5.2 Finished work is cleaned, packaged with installation hardware and stored following workplace practices
- 5.3 Tools and equipment are cleaned, maintained and stored
- 5.4 Faulty tools and equipment are reported to appropriate personnel
- 5.5 Work area is cleaned and waste is disposed of in accordance with workplace practices and environmental legislation covering disposal of industrial waste
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| J737 | MSF30913 | Certificate III in Blinds, Awnings, Security Screens and Grilles | Qualification |
| J725 | MSF20113 | Certificate II in Furnishing | Qualification |