Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Coordinate plant shut down

Coordinate plant shut down

Unit of competency
National Code
PMAOPS522A
State Code
W8900
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
30/04/2010
State Implementation and Classification
Approved Date
18/12/2008
Field of Education
030717 - Plant And Machine Operations
Original Release Date
18/12/2008
Nominal Hours
50
Description
This unit of competence applies to a plant technician who is performing the plant shutdown coordinator role as their primary activity. This is for a planned plant shutdown for maintenance or process activities. The technician will be implementing/executing the shutdown plan rather than developing the shutdown plan This technician would be part of a team working with technical experts, maintenance experts, contractor representatives, process/production teams and management.
Notes
Elements and Performance Criteria
1. Identify shutdown work scope
  • 1.1. Analyse relevant information for activities intended for the shutdown
  • 1.2. Complete a list of all activities intended for shutdown
  • 1.3. Prioritise list and identify all essential work
  • 1.4. Identify conflicts between proposed activities
2. Plan and schedule resources
  • 2.1. Identify each individual task in the shutdown process
  • 2.2. Determine resources required for each task and assign appropriate owner
  • 2.3. Determine prerequisite tasks prior to shutting down process
  • 2.4. Ensure hazards are identified and controls are in place
  • 2.5. Ensure all safety and testing equipment is calibrated and on site prior to shutdown commencing
  • 2.6. Compile a schedule to track shutdown and equipment preparation sequence
3. Co-ordinate plant/ equipment shutdown sequence
  • 3.1. Prepare/review shutdown documentation
  • 3.2. Coordinate plant shutdown as per procedures
  • 3.3. Track plant shutdown progress.
  • 3.4. Coordinate execution of critical function test during shut down phase
  • 3.5. Coordinate equipment preparation
  • 3.6. Validate equipment is safe to handover to appropriate work party.
4. Handover plant/ equipment to relevant work party
  • 4.1. Handover plant and equipment to relevant work group per site protocol
  • 4.2. Perform safety audits during shutdown work
  • 4.3. Record/report HSE non conformance
  • 4.4. Communicate as and when required
  • 4.5. Monitor shutdown work against critical path
  • 4.6. Monitor resource usage and take appropriate action
  • 4.7. Identify barriers to achieving shutdown critical path and negotiate solution.
5. Communicate with all relevant stakeholders
  • 5.1. Communicate shutdown plan/schedule to operations team
  • 5.2. Attend and contribute to regular shutdown progress meetings
  • 5.3. Record and report daily shutdown activities.
  • 5.4. Ensure all authorisations required for tasks have been obtained
  • 5.5. Identify, communicate and mange HSE issues arising during execution of shut down activities
  • 5.6. Contribute to post shutdown review.
6. Return plant to service
  • 6.1. Confirm that all scheduled work on equipment is complete before hand back is accepted
  • 6.2. Ensure equipment hand back documentation complete per site protocol
  • 6.3. Coordinate pre-start equipment integrity checks
  • 6.4. Coordinate and validate plant de-isolation and preparation for service
  • 6.5. Ensure appropriate plant start up authority is obtained
  • 6.6. Coordinate start up critical function tests as required
  • 6.7. Coordinate and record plant start up progress
RANGE STATEMENT
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicized wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This unit of competency includes all such items of equipment and unit operations, which are covered by the shutdown. Where only a plant area is being shut (or one plant in an integrated complex), it also includes the impact of the shut on those areas still operating.
Reason for shut down
The reason for plant shut down may include:
planned shutdown for regulatory vessel inspections
major maintenance
catalyst or column regeneration/repacking
other activities requiring plant shutdown to access
Organisation systems
Organisation systems applications/data bases may include:
MAXIMO/SAP or other relevant work management tool as appropriate for area of responsibility
Scheduling tools such as MS Project, Excel, Gant Chart, Primavera or similar
other electronic recording / reporting software systems
paper based reports/record systems
Hazard identification tools
Hazard Identification tools may include but not be limited to:
hazard and operability studies (HAZOP)
hazard analysis studies (HAZAN)
job hazard/safety analysis (JHA/JSA)
safe work method statements (SWMS)
risk matrix
Activities intended for shutdown
Activities intended for shutdown may come from:
maintenance planning
process/production records
other sources
Resources required for task
Resources required for task include:
time
people
material
other
Resource requirements
Resource requirements may include but not limited to:
utility services such as steam, nitrogen, power, water, chemicals
workforce such as operators, maintenance, contractors, engineers, laboratory staff, safety observer, standby rescue crew
mobile equipment such as elevated work platforms, Hiab, vacuum trucks, drip trays
other equipment such as hoses, plugs and caps, scaffold, extra fire protection equipment
Shut down documentation
Shut down documentation include:
procedures
packages
isolation lists
blinds list
punch lists
Equipment preparation
Equipment preparation includes:
isolation
blinding/spading
purging
ventilation
washing
Communication
Communication includes:
preparations
overnight activities
progress
problems
potential delays
Health Safety and Environment (HSE)
All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.

Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Typically this unit will be assessed by a shutdown planning project. As shutdowns may not occur with sufficient frequency or planning to allow for assessment of all elements, performance criteria, required skills and knowledge, simulation may be required to assess some aspects of this competency.
This unit of competency requires a significant body of knowledge, which will be assessed through questioning and the use of what if scenarios both on the plant (during demonstration of normal operations and walk throughs of abnormal operations) and off the plant.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to undertake a structured analysis of the activities to be completed during the shutdown and then undertaking the coordination in a systematic manner.
Consistent performance should be demonstrated, in the following:
in-depth analysis of all proposed shut down activities to eliminate conflicts and minimise the shutdown critical path
resource management maximises pre shutdown preparations to minimise interruptions to the critical path
coordinate shutdown team to ensure safe and efficient plant shutdown and preparation per procedures without incident.
coordinate track shutdown activities to ensure critical path milestones are reached per plan
contingencies are developed to overcome unforseen barriers to plan
record and report all aspects of shutdown activities to stakeholders per enterprise protocol

Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions, which will be used to probe the reasoning behind the observable actions

Method of assessment
Typically this unit will be assessed by performing a shutdown coordination project. Assessment should be evidence based through direct observation and the compilation of an evidence portfolio to support the Elements, Performance Criteria, Skills and Knowledge requirements of this competency
It may be appropriate to assess this unit concurrently with other relevant units

Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Replaced By
State Code National Code Title Type
AXM71 PMAOPS522 Coordinate plant shutdown Unit of competency