Unit of competency Outline
Date retreived
22/07/2026 6:18 PM AWST
22/07/2026 6:18 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare architectural door hardware schedules
Prepare architectural door hardware schedules
Unit of competency
National Code
MSFAH4002
MSFAH4002
State Code
WI250
WI250
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030113 - Cabinet Making
Original Release Date
20/06/2014
Nominal Hours
80
Description
This unit of competency covers examining and assessing door hardware and keying requirements across commercial, industrial and residential applications. It requires the ability to source relevant information, determine client requirements and use appropriate assessment methods to ensure an accurate determination of architectural hardware equipment/system options to meet client needs. The unit also includes compiling equipment and system requirements keying into schedules for clients.Where estimates and quotes specifically for security systems are required, CPPSEC3047A Provide estimate and quote on security system should also be selected.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Obtain brief from clients
- 1.1 Job requirements are reviewed and clarified with appropriate persons in accordance with organisational requirements
- 1.2 Discussions with customer/client are conducted to establish and clarify scope of work
- 1.3 Effective interpersonal techniques are applied when interacting with clients
- 1.4 Specific site requirements are identified and details are correctly documented
- 1.5 Architectural hardware requirements are discussed and applicable legislation, codes and national standards are clarified and agreed upon
- 1.6 Brief documents and architectural plans are arranged in accordance with organisational requirements or company policies
2 Gather, interpret and review information for preparation of hardware schedules
- 2.1 Site restrictions, regulations and requirements are identified and complied with in accordance with applicable legislation, codes and national standards, and organisational requirements
- 2.2 Information is gathered from identified sources and is relevant to assignment requirements in accordance with applicable legislation, codes and national standards, client and organisational requirements
- 2.3 An assessment is carried out to identify door and frame types and locations to facilitate the accurate determination of architectural hardware requirements
- 2.4 Clients activities and existing architectural hardware arrangements are reviewed to ensure uniformity throughout project
- 2.5 Inconsistency and environmental factors affecting the architectural hardware of the site are identified and assessed in accordance with organisational policies and procedures
3 Produce architectural door hardware schedules
- 3.1 Information is recorded and documented in accordance with computer program and/or organisational template requirements
- 3.2 Architectural hardware is integrated to reflect building security and electronic requirements
- 3.3 An architectural hardware schedule is prepared in accordance with industry and organisational standards of style, format and accuracy
- 3.4 Recommendations for architectural hardware and alternative options are made in accordance with organisational requirements
- 3.5 Documentation is processed in accordance with applicable legislation, codes and national standards, assignment and organisational requirements
- 3.6 A comprehensive assessment of client architectural hardware requirements is completed within designated timeframes and presented for review to appropriate person
4 Prepare and review keying schedules
- 4.1 Principles of master keying are applied in accordance with industry practice and organisational requirements
- 4.2 Keying matrix is developed to client requirements, allowing for future system expansion and mechanical capabilities of system
- 4.3 Client keying requirements are confirmed and clarified according to organisational procedures
- 4.4 Appropriate levels of security/access are reviewed with respect to clients assets, activities and existing security arrangements
- 4.5 Information is recorded and documented in accordance with computer program and/or organisational template requirements
- 4.6 Client requirements are matched to the mechanical possibilities and limitations of master key systems
- 4.7 Options are identified and client is advised on options and alternatives
- 4.8 Sources of assistance in assessing requirements for key systems and master key systems are identified and assistance is sought from appropriate person in accordance with organisational procedures
5 Finalise documentation for submission to client
- 5.1 Final architectural hardware and/or keying requirements are reviewed and confirmed with client in accordance with organisational requirements
- 5.2 Documentation is accurately prepared and processed and stored in accordance with client, legislative and organisational requirements
- 5.3 Architectural hardware and keying schedules and other documentation are prepared according to organisational procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC787 | LMFAH4002A | Prepare architectural door hardware schedules | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAK05 | MSFAH4004 | Prepare architectural door hardware schedules | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J742 | MSF40213 | Certificate IV in Furniture Design and Technology | Qualification |