Unit of competency Outline
Date retreived
22/07/2026 6:24 AM AWST
22/07/2026 6:24 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and control dam operations
Monitor and control dam operations
Unit of competency
National Code
NWPCAD008
NWPCAD008
State Code
OBO35
OBO35
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
15/06/2020
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
15/06/2020
Nominal Hours
50
Description
This unit involves the skills and knowledge required to monitor and control dam operations.It includes preparing for and implementing dam operation plans and inspecting and testing dam emergency backup equipment. This unit applies to those working as field and operational staff with a specific responsibility for the operation of dams. Those undertaking this unit would work under appropriate supervision while performing routine tasks in a limited range of familiar contexts.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for dam operation
- 1.1 Identify and apply relevant workplace procedures, guidelines and regulatory requirements for dam operation
- 1.2 Schedule and prioritise operational activities and obtain relevant approval
- 1.3 Notify relevant stakeholders of operational plans
2 Implement dam operations
- 2.1 Follow dam operation plan and procedures
- 2.2 Inspect, operate and test isolating and regulating equipment
- 2.3 Test and record dam standby and emergency backup equipment
3 Compile and process operation reports
- 3.1 Collect operational data from measurement instruments, inspections and relevant personnel
- 3.2 Process, evaluate, validate, record and store operational data
- 3.3 Record and report structural, material and/or equipment problems and recommend remedial action to relevant personnel
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVY49 | NWPSOU022 | Monitor and control dam operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AD275 | NWPSS00004 | Dam operations | Skill set |
| BHQ7 | UEP30122 | Certificate III in ESI Generation | Qualification |
| BIO0 | UEP30322 | Certificate III in ESI Generation | Qualification |
| BFB4 | NWP30219 | Certificate III in Water Industry Operations | Qualification |
| BIH1 | NWP30222 | Certificate III in Water Industry Operations | Qualification |