Unit of competency Outline

Date retreived
22/07/2026 12:55 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Coordinate system operations in a regulated energy market

Coordinate system operations in a regulated energy market

Unit of competency
National Code
UETTDRSO19A
State Code
WA561
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
21/07/2011
State Implementation and Classification
Approved Date
28/06/2010
Field of Education
080399 - Business And Management, N.e.c.
Original Release Date
28/06/2010
Nominal Hours
100
Description
1).1.1) DescriptorThis Competency Standard Unit covers the coordination of system operations in a regulated energy market. It includes the relevant application of knowledge of the National Electricity Market (NEM), the practices and rules used in facilitating the coordination of operations in a regulated energy market.
Notes
Elements and Performance Criteria
1 Plan to coordinate System Operations in a regulated energy market
  • 1.1 OHS practices/procedures and environmental and sustainable energy procedures, which may influence the coordination of the electricity market are reviewed and determined.
  • 1.2 Energy market requirements are established after data is analysed and expected outcomes of the work are confirmed with the appropriate personnel.
  • 1.3 Energy market and associated equipment operational prerequisites are identified and established in accordance with manufacturers and/or enterprise/site procedures
  • 1.4 Electricity market coordination and control procedures are discussed with and/or directed to the appropriate personnel in order to ascertain the project brief.
  • 1.5 Testing parameters are ascertained from established policies, procedures and specifications.
  • 1.6 Equipment/tools and personal protective equipment are selected based on specified Performance Criteria and established procedures.
  • 1.7 Work roles and tasks are allocated according to requirements and individuals' competencies.
  • 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures.
  • 1.9 Liaison and communication issues with other/authorised personnel, authorities and clients are resolved and activities coordinated to carry out work.
  • 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule.
  • 1.11 Need for relevant work permits is identified to coordinate the performance of work according to requirements and/or established procedures.
  • 1.12 Circuit/systems modelling are used to evaluate alternative proposals as per established procedures.
2 Coordinate System Operations in a regulated energy market
  • 2.1 Strategic plans are developed incorporating organisational initiatives as per established procedures
  • 2.2 OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures.
  • 2.3 Decisions concerning the coordination are made on the basis of safety and effective outcomes according to requirements and/or established procedures.
  • 2.4 Stakeholders/customers are kept informed of current status regarding plan progress and recent developments
  • 2.5 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures.
  • 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the work within an agreed timeframe according to requirements.
  • 2.7 Testing of the decision to be implemented is undertaken according to requirements and established procedures.
  • 2.8 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures.
  • 2.9 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements.
  • 2.10 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards.
3 Complete the coordination of System Operations in a regulated energy market
  • 3.1 Final review of the coordination is undertaken to ensure it complies with all requirements and include all specifications and documentations needed to complete the work.
  • 3.2 Appropriate personnel are notified of completion and reports and/or completion documents (electronic/paper) are finalised/commissioned.
  • 3.3 Reports and/or completion documents (electronic/paper) are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval.
  • 3.4 Approved copies of coordination documents (electronic/paper) are issued and records are updated in accordance with established procedures.
RANGE STATEMENT
8) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
This unit shall/may be demonstrated in relation to the knowledge of the structure, operation of the National Electricity Market and the impact of the National Electricity Rules on the operation of the power system.
It includes but it is not limited to a knowledge of dispatch of energy and ancillary services in the NEM, electrical market auto loading procedures; the ensuing flows and operation of the network, transmission plant loadings, stable system operation, planned and unplanned network outages, restoration of the system following system events, black system restart
The following constants and variables included in the Element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:

Appropriate and relevant persons (see Personnel)
Appropriate authorities
Assessing risk
Assessment
Authorisation
Emergency
Established procedures
Legislation
Notification
OHS practices
OHS issues
Quality assurance systems
Requirements
Market participant
Network service providers,
Non market participants,
Australian Energy Market Commission
Australian Energy Regulator
National Electricity Market Management Company
EVIDENCE GUIDE
9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the competency standard unit and the Training Package Assessment Guidelines.
The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.
Overview of Assessment
9.1)
Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry's preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be 'rich' in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its 'richness'. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.
Critical aspects of evidence required to demonstrate competency in this unit
9.2)
Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each Element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the "Assessment Guidelines - UET09". Evidence shall also comprise:
A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:

Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and
Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and
Demonstrate an understanding of the essential knowledge and associated skills described in this unit to such an extent that the learner's performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and
Demonstrate an appropriate level of employability skills; and
Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and

Demonstrated performance across a representative range of contexts from the prescribed items below:


Range of tools/equipment/materials/procedures/workplaces/other variables


Group No
The minimum number of items on which skill is to be demonstrated
Item List


A
Perform on at least three (3) occasions the following:
Dispatch energy to the electricity market
Respond to electricity market fluctuations/demands
Manipulate the system to ensure reliable operation in response to electricity market requirements


B
All of the following:
Principals and objectives of the electricity market
The role of ancillary services in the operation of the electricity market
Service provider obligations in the electricity market
Connection and access requirements to the electricity market
Analysis of pricing concepts
Contractual obligations
Scheduling of generation assets


C
At least one occasion
Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.
Context of and specific resources for assessment
9.3)
This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake the operation of the power system within the NEM
Note:
Access will be needed to: relevant modelling tools, drawings, computerised electrical plant control and monitoring facilities and enterprise operational policies, procedures and work practices.

In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working in realistic environment and a variety of conditions.
Method of assessment
9.4)
This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 "Assessment Guidelines".
Note:Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.
Concurrent assessment and relationship with other units
9.5)
There are no concurrent assessment recommendations for this unit.
Replaced By
State Code National Code Title Type
WD766 UETTDRSO49A Coordinate power system operations in a regulated energy market Unit of competency
No information