Unit of competency Outline
Date retreived
22/07/2026 8:15 PM AWST
22/07/2026 8:15 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct aluminium Venetian-style blinds
Construct aluminium Venetian-style blinds
Unit of competency
National Code
MSFBA2008
MSFBA2008
State Code
WI259
WI259
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/06/2014
Nominal Hours
56
Description
This unit of competency covers constructing aluminium Venetian-style blinds. It applies in small to large scale enterprises.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Establish work requirements and prepare for work
- 1.1 Work health and safety (WHS) requirements, legislative requirements and workplace practices are observed throughout the work
- 1.2 Personal protective equipment is selected and used
- 1.3 Work orders are checked and confirmed
- 1.4 Tools and equipment are selected and checked for safe operation
- 1.5 Aluminium solid or perforated coil stock, hardware and fixings are selected and checked against work order
2 Assemble blind
- 2.1 Head and bottom rails are selected, measured and cut
- 2.2 Cords and ladder braids are selected, cut and attached to head rail
- 2.3 Hardware is attached to head and bottom rails
- 2.4 Venetian blind machine is set up according to manufacturer instructions
- 2.5 Headrail is attached to Venetian blind machine and the machine run to cut, punch and attach slats to head rail
- 2.6 Blind is placed on hoist and bottom rail installed
- 2.7 Ladders are crimped to final blind size
- 2.8 Finishing hardware is installed
- 2.9 Child safety mechanisms as required by legislation or code of practice are selected and attached
3 Make quality checks
- 3.1 Finished blinds are checked ensuring length and width match work order
- 3.2 Finished blind is tested within limits of normal operation for correct operation and parts of the work that do not comply with work order are repaired or re-worked
4 Complete work
- 4.1 Finished work is cleaned, protected and stored following workplace practices
- 4.2 Tools and equipment are cleaned, maintained and stored
- 4.3 Faulty tools and equipment are reported to appropriate personnel
- 4.4 Work area is cleaned and waste is disposed of in accordance with workplace practices and environmental legislation covering disposal of industrial waste
- 4.5 Workplace documentation or reporting is completed
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| J737 | MSF30913 | Certificate III in Blinds, Awnings, Security Screens and Grilles | Qualification |
| J725 | MSF20113 | Certificate II in Furnishing | Qualification |