Unit of competency Outline
Date retreived
22/07/2026 12:51 AM AWST
22/07/2026 12:51 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate and monitor river system usage
Coordinate and monitor river system usage
Unit of competency
National Code
NWP419B
NWP419B
State Code
D1950
D1950
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
Nominal Hours
40
Description
This unit of competency describes the outcomes required to monitor and coordinate the operation of river systems and measure and report on river flows, including flood plains and the river environment.
Notes
Elements and Performance Criteria
1Confirm performance measures in river system management plan.
- 1.1 Identify water flow requirements.
- 1.2 Identify water quality and quantity requirements.
- 1.3 Identify environmental factors that impact on water flows and quality.
- 1.4 Identify performance measures for the resource and operations.
2Monitor performance of assets.
- 2.1 Correctly select, fit and use equipment, including personal protective equipment.
- 2.2 Apply monitoring and testing programs.
- 2.3 Monitor assets to ensure performance meets specifications in the river system management plan.
3Coordinate processes.
- 3.1 Monitor water usage and quality according to the river system management plan.
- 3.2 Coordinate processes to meet planned requirements and targets.
- 3.3 Apply system adjustments to ensure that system performance meets organisational and statutory requirements.
4Report outcomes of coordination and monitoring.
- 4.1 Analyse, record and report coordination and monitoring data according to organisational requirements.
- 4.2 Identify current and/or potential problems and report according to organisational procedures.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Equipment used may include:
electronic monitoring and metering systems
manual chart recording systems
on- and off-road vehicles
communication equipment
personal protective equipment
System adjustments may include:
regulation of flow and pressure, including the adjustment of:
pumping systems
valving systems
control systems
Organisational and statutory requirements may include:
by-laws and organisational policies
standard operating procedures
environment protection
relevant Australian Standards
manufacturer's standards and specifications.
equal employment opportunity
occupational health and safety
World Health Organisation and National Health and Medical Research Council (NHMRC) guidelines
Equipment used may include:
electronic monitoring and metering systems
manual chart recording systems
on- and off-road vehicles
communication equipment
personal protective equipment
System adjustments may include:
regulation of flow and pressure, including the adjustment of:
pumping systems
valving systems
control systems
Organisational and statutory requirements may include:
by-laws and organisational policies
standard operating procedures
environment protection
relevant Australian Standards
manufacturer's standards and specifications.
equal employment opportunity
occupational health and safety
World Health Organisation and National Health and Medical Research Council (NHMRC) guidelines
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to coordinate and monitor river system usage including:
identifying water flow, water quality and water quantity requirements
identifying relevant environmental factors to be considered
identifying performance measures for the resource and operations
implementing monitoring and testing programs, including monitoring of assets, water usage and water
coordinating processes and making system adjustments
analysing and reporting data and reporting problems
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to coordinate and monitor river system usage including:
identifying water flow, water quality and water quantity requirements
identifying relevant environmental factors to be considered
identifying performance measures for the resource and operations
implementing monitoring and testing programs, including monitoring of assets, water usage and water
coordinating processes and making system adjustments
analysing and reporting data and reporting problems
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| M1950 | NWP419A | Co-ordinate and monitor river systems usage | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D246 | NWP40107 | Certificate IV in Water Operations | Qualification |