Unit of competency Outline
Date retreived
22/07/2026 10:02 AM AWST
22/07/2026 10:02 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan low voltage switchboard and control panel layouts
Plan low voltage switchboard and control panel layouts
Unit of competency
National Code
UEEEL0059
UEEEL0059
State Code
OBZ27
OBZ27
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to plan low voltage (LV) switchboard and control panel layout.It includes preparing and planning the layout of electrical switchboards and control panel operating at voltages up to 1,000 volts (V) alternating current (a.c.) or 1,500 V direct current (d.c.) and fault levels not exceeding 20 kiloamps (kA) for approval.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to plan switchboard and control panel layout
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) risk control measures and workplace procedures for carrying out work activities are identified, obtained and applied
- 1.2 Scope of switchboard and control panel layouts is determined from job specifications and/or design brief
- 1.3 Switchboard and control panel layout safety and regulatory requirements are identified, obtained and applied in accordance with WHS/OHS requirements and relevant industry standards
- 1.4 Equipment to be incorporated in the switchboard and control panel is determined from job specifications and/or design brief
2 Plan switchboard and control panel layout
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out work activities are documented
- 2.2 Equipment is selected in accordance with technical standards, job specifications and requirements
- 2.3 Switchboard and control panel layouts are planned to accommodate equipment with sufficient clearance to enable wiring/connecting and servicing from job specifications
- 2.4 Switchboard and control panel layouts are planned in accordance with WHS/OHS and relevant industry standards
- 2.5 Switchboard and control panel layout draft is checked with the design brief and in accordance with relevant industry standards
- 2.6 Switchboard and control panel layout is documented for submission to appropriate person/s for acceptance and approval
- 2.7 Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
3 Obtain approval for switchboard and control panel layout
- 3.1 Requests for alterations to the layout are negotiated with appropriate person/s in accordance with workplace procedures
- 3.2 Final layout design is documented and approval obtained from appropriate person/s
- 3.3 Switchboard and control panel layout documentation is forwarded to appropriate person/s for production
- 3.4 Quality of work is monitored in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC486 | UEENEEG128A | Plan low voltage switchboard and control panel layouts | Unit of competency |