Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install standalone photovoltaic power systems

Install standalone photovoltaic power systems

Unit of competency
National Code
UEENEEK034B
State Code
W8172
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
29/07/2011
State Implementation and Classification
Approved Date
09/12/2010
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
09/12/2010
Nominal Hours
54
Description
1) 1.1) DescriptorThis competency standard unit covers the installation, adjustment and set up of stand-alone photovoltaic power systems. It encompasses working safely and to installation standards, matching components with that specified for a given location, placing and securing system components accurately, making required circuit connections and completing the necessary installation documentation.
Notes
Elements and Performance Criteria
1 Prepare to install stand-alone photovoltaic power systems.
  • 1.1 OHS procedures for a given work area are obtained and understood.
  • 1.2 Health and safety risks are identified and established risk control measures and procedures in preparation for the work are followed.
  • 1.3 Safety hazards that have not previously been identified are noted and established risk control measures are implemented.
  • 1.4 Installation of the system is prepared in consultation with others affected by the work and sequenced appropriately.
  • 1.5 The nature and location of the work is determined from documentation or appropriate person to establish the scope of work to be undertaken.
  • 1.6 Siting limitations and customer system requirements are identified by consultation with the customer.
  • 1.7 Energy demand is assessed and recommendations made to the customer for energy efficiency improvements if necessary.
  • 1.8 Suitable system components are specified and selected.
  • 1.9 Location of system components is planned within the constraints of the building structure and regulations.
  • 1.10 Advice is sought from appropriate persons to ensure the work is co-ordinated effectively with others.
  • 1.11 Materials and components needed for the installation work are obtained in accordance with established procedures, pre-assembled where necessary, and checked against job requirements.
  • 1.12 Materials and components are prepared for transport to the site and transport is arranged.
  • 1.13 Tools, equipment and testing devices needed for the installation work are obtained in accordance with established procedures and checked for correct operation and safety.
  • 1.14 Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements.
2 Install stand-alone photovoltaic power systems.
  • 2.1 OHS risk control measures and procedures for carrying out the work are followed.
  • 2.2 Equipment is transported safely to the site.
  • 2.3 The need to test or measure live is determined in strict accordance with OHS requirements and when necessary conducted within established safety procedures.
  • 2.4 Circuits/machines/plant are checked as being isolated where necessary in strict accordance OHS requirements and procedures.
  • 2.5 System components are installed to comply with technical standards and job specifications and requirements with sufficient access to affect terminations, adjustment and maintenance.
  • 2.6 Wiring is terminated at components and associated equipment in accordance with manufacture's specifications and functional and regulatory requirements.
  • 2.7 Established methods for dealing with unexpected situations are discussed with appropriate person or persons and documented.
  • 2.8 Unexpected situations are dealt with safely and with the approval of an authorised person.
  • 2.9 On-going checks of the quality of installed apparatus are undertaken in accordance with established procedures.
  • 2.10 System installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles.
3 Complete installation and report installation activities.
  • 3.1 OHS work completion risk control measures and procedures are followed.
  • 3.2 Work site is cleaned and made safe in accordance with established procedures.
  • 3.3 Final checks are made to that the installed apparatus conforms to requirements.
  • 3.4 System operation is tested and installation verified to be compliant with standards and work specifications.
  • 3.5 'As-installed' apparatus and associated equipment is documented and an appropriate person or persons notified in accordance with established procedures.
  • 3.6 Customer is informed of the system operation, routine maintenance and limitations.
  • 3.7 Appropriate documentation as required by standards or job specifications is provided to the customer.
No information
No information
Replaced By
State Code National Code Title Type
WC704 UEENEEK134A Install ELV stand-alone photovoltaic power systems Unit of competency