Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct intermediate scaffolding operations

Conduct intermediate scaffolding operations

Unit of competency
National Code
RIIHAN302D
State Code
WH309
TGA Status
Current
DTWD Status
Approved
Current Release Number
4.00
Current Release Date
11/12/2018
State Implementation and Classification
Approved Date
28/05/2014
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
28/05/2014
Nominal Hours
100
Description
This unit describes the skills and knowledge required to conduct intermediate scaffolding operations, including planning for intermediate scaffolding, and erecting, maintaining and dismantling scaffolding.This unit is appropriate for those working in site-based roles.The work required in this unit relates to the National Standard for High Risk Work but this unit does not provide the licence. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors, and must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for intermediate scaffolding operations
  • 1.1 Access, interpret and apply intermediate scaffolding operations documentation and ensure the work activity is compliant
  • 1.2 Obtain, read, interpret, clarify and confirm work requirements
  • 1.3 Select and wear personal protective equipment appropriate for work activities
  • 1.4 Develop a preliminary scaffolding plan and site sketch
  • 1.5 Check and confirm job feasibility and schedule with appropriate personnel
  • 1.6 Identify and address potential risks, hazards and environmental issues, and implement control measures
  • 1.7 Finalise and confirm the scaffolding plan, including the scheduling of required resources
2. Prepare intermediate scaffolding
  • 2.1 Identify, select, inspect and certify as serviceable scaffolding equipment, materials and tools
  • 2.2 Label and repair or dispose of unserviceable scaffolding equipment, materials and tools
  • 2.3 Prepare scaffolding/equipment gear
  • 2.4 Arrange and coordinate transportation of equipment and tools to the worksite in accordance with the scaffolding plan
  • 2.5 Prepare the site for scaffolding
3. Erect intermediate scaffolding
  • 3.1 Carry out erection of intermediate scaffolding
  • 3.2 Perform work safely at heights, on incomplete structures and in confined spaces
  • 3.3 Leave the site clean of all surplus components, equipment, tools and debris
  • 3.4 Inspect the scaffolding/equipment
4. Maintain intermediate scaffolding
  • 4.1 Inspect critical structural and safety areas of the scaffolding/equipment, and identify any variation from the plan
  • 4.2 Perform alteration or repair with due regard for the critical safety and structural areas of the scaffolding/equipment
5. Dismantle intermediate scaffolding
  • 5.1 Dismantle scaffolding in a safe and orderly manner
  • 5.2 Inspect, classify, label and remove equipment from the site
No information
No information
Replaces
State Code National Code Title Type