Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Check and repair track geometry
Check and repair track geometry
Unit of competency
National Code
TLIB3094
TLIB3094
State Code
AVK45
AVK45
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
35
Description
This unit involves the skills and knowledge required to check and repair track geometry, in accordance with safeworking and regulatory requirements, workplace procedures and rail network geometry specifications.It includes determining the job requirements, restoring track geometry, checking track compliance after work and completing required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally in a team environment. It involves the application of routine operational principles and procedures when checking and repairing track geometry, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 Faults and deficiencies in track geometry are identified, and work required to restore track to required standard is determined
- 1.2 Hazards are identified, risks assessed and control measures implemented
- 1.3 Appropriate repair methods are identified to enable repairs to be conducted
- 1.4 Job requirements and resources are determined in accordance with workplace procedures and scope of work
2 Restore track geometry
- 2.1 Survey data is used as required to establish correct geometry
- 2.2 Appropriate lifting and lining methods and equipment are used to lift and line track to restore running surface to required geometry in accordance with workplace standards and procedures
3 Confirm compliance after work
- 3.1 Track geometry is checked for compliance with rail network standards
- 3.2 Vertical and horizontal structural and overhead clearances are checked against required standards to allow safe passage of trains
- 3.3 Track structure where work has been undertaken is checked for compliance with standards required to enable reinstatement of service
- 3.4 Appropriate operating conditions are applied in accordance with workplace procedures
4 Complete documentation
- 4.1 Required documentation procedures and processes are confirmed in accordance with workplace procedures
- 4.2 Documentation is completed and processed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8268 | TLIB3094B | Check and repair track geometry | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHV6 | TLI37122 | Certificate III in Rail Infrastructure | Qualification |
| BGM6 | TLI37120 | Certificate III in Rail Infrastructure | Qualification |
| BHI6 | TLI37121 | Certificate III in Rail Infrastructure | Qualification |
| AWQ2 | TLI32515 | Certificate III in Rail Infrastructure | Qualification |
| AWQ7 | TLI31815 | Certificate III in Rail Track Surfacing | Qualification |