Unit of competency Outline
Date retreived
23/07/2026 12:22 AM AWST
23/07/2026 12:22 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design complex (non-solar) heated water systems
Design complex (non-solar) heated water systems
Unit of competency
National Code
CPCPCM5013
CPCPCM5013
State Code
OCN07
OCN07
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
60
Description
This unit specifies the skills and knowledge required to design complex (non-solar) heated water supply and distribution systems for buildings with 29 floors, inclusive of basement and fixtures on each level for residential, commercial and industrial applications. The unit includes circulating systems, fuel and energy loads and system selection.The role may involve interaction with architects, builders, suppliers, clients and relevant planning authorities and requires sound understanding of applicable legislation, standards and codes.This unit’s requirements are typically carried out by experienced tradespeople such as hydraulic design consultants or persons in a supervisory capacity in relation to plumbing services.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Evaluate design parameters.
- 1.1 Establish scope of work for heated water supply and distribution systems from relevant Australian Standards, codes, plans, specifications and client brief.
- 1.2 Analyse and apply statutory and regulatory requirements for the design of complex (non-solar) heated water supply and distribution systems.
- 1.3 Apply sustainability principles and concepts as part of the design process.
- 1.4 Establish performance requirements considering the safety of system users and building occupants, including the control of Legionella bacteria.
- 1.5 Conduct research, including a desktop study to outline design parameters.
- 1.6 Interpret manufacturer requirements and trade and technical manuals for the design of heated water systems.
- 1.7 Conduct a cost-benefit analysis to compare a range of materials and system designs.
2 Plan and detail system components.
- 2.1 Plan layout of pipework systems and type and location of fittings and valves.
- 2.2 Detail thermostatic mixing, tempering and control valves for a range of applications using appropriate symbols.
- 2.3 Plan and detail circulating heated water supply systems.
- 2.4 Plan and detail warm water systems, including disinfection and biocontrol measures.
- 2.5 Conduct calculations to determine water heating sizing and detail methods for the control of expansion.
- 2.6 Calculate pipe sizes and design pipe supports for a range of applications.
- 2.7 Detail manifolding heated water units for a range of water heaters and specify safe trays and overflows.
- 2.8 Specify approved materials and jointing methods and insulation materials and installation requirements for a range of water heaters and heated water systems.
- 2.9 Provide allowance for expansion and contraction.
- 2.10 Include acoustic performance of the system in plans.
3 Design and size systems.
- 3.1 Design complex (non-solar) heated water supply and distribution systems using plans and details of system components and established design parameters.
- 3.2 Design suitable system approaches.
- 3.3 Design and size system using manufacturer's design information and calculations.
- 3.4 Calculate pipe sizes, velocities and pressures according to manufacturer's piping design requirements.
4 Prepare documentation
- 4.1 Prepare client brief of the preferred design.
- 4.2 Prepare plans and specifications.
- 4.3 Prepare testing and commissioning schedule.
- 4.4 Produce operation and maintenance manual.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF854 | CPCPCM5013A | Design complex (non-solar) heated water systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGB3 | CPC50620 | Diploma of Hydraulic Services Design | Qualification |