Unit of competency Outline

Date retreived
22/07/2026 6:45 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan sewerage reticulation systems

Plan sewerage reticulation systems

Unit of competency
National Code
NWP605
State Code
WD486
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
06/11/2014
Nominal Hours
80
Description
This unit of competency describes the outcomes required to plan sewerage reticulation systems.
Notes
Elements and Performance Criteria
1 Develop servicing strategy
  • 1.1 Determine existing sewerage system load requirements and calculate future loads in accordance with organisational strategic and business plans and contracts.
  • 1.2 Identify planning authority requirements and determine and assess the environmental impacts of the project.
  • 1.3 Analyse constraints that may be applied to meet load requirements.
  • 1.4 Conduct catchment analysis to determine holistic servicing requirements.
2 Plan and prepare concept proposal
  • 2.1 Prepare preferred options as the Concept Plan incorporating the outcomes of an analysis of the catchment and the options for servicing future development.
  • 2.2 Establish criteria to control risks.
  • 2.3 Consider operations and maintenance requirements.
  • 2.4 Determine lifecycle costs.
  • 2.5 Review parameters of the planning process using initial data and using approved empirical or modelling systems.
3 Prepare and manage supporting documents
  • 3.1 Prepare supporting documentation in accordance with legislative and organisation requirements.
  • 3.2 Maintain engineering and project records in accordance with legislative or organisation requirements.
4 Evaluate planning methods and outcomes
  • 4.1 Review concept proposals against the planning requirements and implementation.
  • 4.2 Conduct consultations with parties with an interest in the proposal.
  • 4.3 Make recommendations for changes to the concept proposal.
  • 4.4 Make final recommendations for system design.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Sewerage systems may include:
reticulation, branch and trunk sewers
sewage pumping stations
storage
Environmental impacts or risks may include:
visual
odour
noise
social
political
natural
cultural
infrastructure
Catchment analysis may apply to:
existing reticulation systems
existing and future hydraulic load
incorporation into overall system
impact, extent and sizing of facilities geotechnical considerations
Modelling systems may include:
empirical systems
manual models
computer models
Legislative and organisation requirements may include:
world health organisation guidelines
national health and medical research council guidelines and recommendations
federal and state legislation
codes
national guidelines
environmental protection agencies
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The candidate should:
perform each task outlined in the elements consistently and in a representative range of contexts
meet the performance criteria associated with each element by employing the techniques, procedures, information and resources available in the workplace from those listed in the range statement
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to plan wastewater collection systems including:
identifying, analysing and defining waste water collection system planning requirements, conditions and constraints
identifying and interpreting legislative, environmental, business and project management requirements
developing scenario options for future needs and conditions
analysing a range of factors to determine catchment impacts
planning, preparing and selecting options for system design
managing and securing documentation to support and report project management
evaluating, and consulting on proposals to gauge impact and support
making recommendations on the planning and design requirements for wastewater collection systems
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
workplace specific equipment and technology
supervision and experienced team members to provide observations, feedback and third party reports
enterprise operating procedures and work allocation
relevant codes, standards and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Method of assessment
The following methods are suggested:
assessment in the workplace or in a simulated workplace and under the normal range of workplace conditions
assessment should also be conducted in conjunction with aspects of technical competencies that are consistent with the work environment
techniques for gathering evidence of competency may include:
observation of performance
written and/or oral questioning to assess knowledge and understanding
completion of workplace documents and reports produced as part of routine work activities
third-party reports from experienced practitioners
completion of performance feedback from supervisors and colleagues
Guidance information for assessment
Access must be provided to appropriate learning and assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence require that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence only taken at the point when the assessor has complete confidence in the person’s competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated projectbased activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator and cultural issues that may affect responses to the questions, and will reflect the requirements of the competency and the work being performed.
No information
State Code National Code Title Type
J127 NWP60112 Advanced Diploma of Water Engineering Design Qualification