Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Contribute to coordinated high voltage live line work
Contribute to coordinated high voltage live line work
Unit of competency
National Code
UETTDRIS25B
UETTDRIS25B
State Code
WA505
WA505
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/01/2011
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
20/01/2011
Nominal Hours
50
Description
1) 1.1) DescriptorThis Competency Standard Unit specifies the outcomes required of live line working team members to work effectively as a cohesive team to ensure safety of all team members and the community when undertaking high voltage (HV) live line work. It includes the pre-work briefing on tasks to be undertaken, roles of individual team members, identification of possible hazards, risk management analysis and implementation of palliative measures to control or mitigate the risk to acceptable levels. It also encompasses the monitoring of work performance to ensure safety, and the post-work debriefing to identify areas for continuous improvement.
Notes
Elements and Performance Criteria
No information
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD691 | UETTDRIS65A | Contribute to coordinated HV live working | Unit of competency |