Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop high voltage switching schedule
Develop high voltage switching schedule
Unit of competency
National Code
UETTDRIS48
UETTDRIS48
State Code
OBH67
OBH67
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
54
Description
This unit covers the preparation of a basic switching schedule for interconnected high voltage (HV) network plant. It includes planning basic outages and taking into account loading of network components. It also includes the calculation of network loading conditions to ensure the network is operating within designed parameters.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare/plan to develop HV switching schedules
- 1.1 Work schedules, including drawings, plans, requirements, established procedures and material lists, are obtained and analysed, as necessary, by site inspection and the extent of the preparation of the work determined for planning and coordination
- 1.2 Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures
- 1.3 Risk control measures are identified, prioritised and evaluated against the work schedule
- 1.4 Relevant requirements and established procedures for the work are communicated to all personnel and identified for all worksites
- 1.5 Hazards are identified, work health and safety (WHS)/occupational health and safety (OHS) risks assessed and control measures prioritised, implemented and monitored, including emergency exits kept clear, to ensure safe systems of work are followed and according to established procedures
- 1.6 Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures
- 1.7 Resources, including personnel, equipment, tools and personal protective equipment (PPE) required for the job are identified, scheduled and coordinated and confirmed safe and in technical working order
- 1.8 Clients/customers are provided with possible solutions and/or options within the scope, acceptable cost and requirements
- 1.9 Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures
- 1.10 Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work
2 Carry out the development of HV switching schedules
- 2.1 WHS/OHS and sustainable energy principles and practices to reduce the incidents of accidents and minimise waste are monitored and actioned in accordance with requirements and/or established procedures
- 2.2 Hazard warnings and safety signs are recognised and hazards and assessed WHS/OHS risks reported to immediate authorised personnel for directions according to established procedures
- 2.3 Remedial actions are taken to overcome any shortfalls encountered in the work schedule according to requirements and/or established procedures
- 2.4 Development of HV switching schedules is carried out in accordance with the work schedule and requirements and/or established procedures
- 2.5 Essential knowledge and associated skills are applied in the safe development of HV switching schedules to ensure completion in an agreed timeframe and to quality standards with a minimum of waste according to requirements
- 2.6 Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements
- 2.7 Ongoing checks of quality of the work are undertaken in accordance with requirements and established procedures to ensure a quality outcome is achieved for the client/customer and to a community/industry standard
3 Complete development of HV switching schedules
- 3.1 Work undertaken is checked against work schedule for conformance with requirements, anomalies reported and solutions identified in accordance with established procedures
- 3.2 Accidents and/or injuries are reported and followed up in accordance with requirements/established procedures
- 3.3 Relevant work permits are signed off and plant is returned to service and client/customer advised in accordance with requirements
- 3.4 Work completion records, reports, as installed/modified drawings and/or documentation and information are confirmed, processed and appropriate personnel notified
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD674 | UETTDRIS48A | Develop high voltage switching schedule | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN15 | UETDRIS003 | Develop high voltage switching schedule | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEV6 | UET40419 | Certificate IV in ESI - Network Systems | Qualification |
| BEV3 | UET40619 | Certificate IV in ESI - Power Systems Network Infrastructure | Qualification |