Unit of competency Outline

Date retreived
23/07/2026 4:45 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Complete simple floor covering installation

Complete simple floor covering installation

Unit of competency
National Code
MSFFL1001
State Code
WI330
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
80
Description
This unit of competency covers completing installation of timber, carpet or resilient floor coverings in a simple context. Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Lay out materials
  • 1.1 Plans and/or drawings are read and interpreted
  • 1.2 Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work
  • 1.3 Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.4 Suitable adhesives, trims and accessories are selected if required
  • 1.5 Materials are laid out to meet specification requirements and minimise waste and joins
2 Prepare materials for installation
  • 2.1 Sequence of work is planned to ensure lay out and fixing is in logical order
  • 2.2 Underlay is cut to specification
  • 2.3 Materials are cut to shape, length and size for final laying
  • 2.4 Adhesives and edge strips are prepared for use as required
3 Lay flooring
  • 3.1 Instructions and sequence for laying and fixing are followed
  • 3.2 Appropriate underlay is laid according to manufacturer recommendations
  • 3.3 Materials for fixing are organised and used in accordance with relevant safety management requirements
  • 3.4 Fixing methods and equipment are used following manufacturer recommendations
  • 3.5 Finished job is inspected and any imperfections are rectified following workplace procedures
4 Complete housekeeping
  • 4.1 Unused materials are stored or recycled as required
  • 4.2 Tools and equipment are cleaned and stored appropriately
  • 4.3 Work area is cleaned and rubbish disposed of appropriately
  • 4.4 Workplace documentation is completed
No information
No information
No information
State Code National Code Title Type
J724 MSF10113 Certificate I in Furnishing Qualification