Unit of competency Outline
Date retreived
22/07/2026 3:23 PM AWST
22/07/2026 3:23 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement track maintenance and construction
Implement track maintenance and construction
Unit of competency
National Code
TLIS3026A
TLIS3026A
State Code
D5352
D5352
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
07/07/2011
Field of Education
039907 - Rail Operations
Original Release Date
07/07/2011
Nominal Hours
35
Description
This unit involves the skills and knowledge required to implement track maintenance and construction in accordance with approved standards, safeworking and regulatory requirements and workplace procedures. It includes planning work, implementing maintenance activities, dealing with maintenance and construction problems, and completing all required documentation. Licensing or certification requirements are not applicable to this unit.
Notes
Elements and Performance Criteria
1Plan work
- 1.1 Scope of work is confirmed including identification of any deficiencies, and preparatory or ancillary work required
- 1.2 Operational constraints are identified
- 1.3 Information requirements are identified and accessed
- 1.4 Method of work is selected and general operating sequence is determined
- 1.5 Resources required for the work are arranged as required
2Implement maintenance activities
- 2.1 Competent personnel are allocated tasks in accordance with the work sequence
- 2.2 Tasks are assessed as being in accordance with the pre-determined sequence and appropriate for the work
- 2.3 Work procedures are monitored and evaluated as being appropriate and in accordance with standards and procedures
- 2.4 Human and other resources are assessed as being adequate for the work
3Deal with maintenance and construction problems
- 3.1 Causes and effects of system faults and failures within the worksite are diagnosed
- 3.2 Impact of work on track system integrity is assessed
- 3.3 Appropriate action is taken to ensure track system integrity
- 3.4 Scope of work is modified to include related tasks/interfaces
- 3.5 Related faults/failures beyond the authorised scope of work are reported
4Complete documentation
- 4.1 Documentation on work undertaken is completed in accordance with workplace requirements
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| S8322 | TLIS3026B | Implement track maintenance and construction | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W932 | TLI32510 | Certificate III in Rail Infrastructure | Qualification |