Unit of competency Outline
Date retreived
22/07/2026 1:14 PM AWST
22/07/2026 1:14 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Operate equipment using pre-preg material
Operate equipment using pre-preg material
Unit of competency
National Code
PMBPROD298B
PMBPROD298B
State Code
W7612
W7612
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
08/12/2008
Field of Education
030717 - Plant And Machine Operations
Original Release Date
08/12/2008
Nominal Hours
30
Description
This competency covers the operation of equipment using pre-preg materials to produce composite products and the resolving of routine problems to procedure in the production process.This competency is typically performed by operators working either independently or as part of a work team.
Notes
Elements and Performance Criteria
1. Check work requirements.
- 1.1 Identify work requirements from procedures.
- 1.2 Identify product, materials and equipment requirements for job(s).
- 1.3 Recognise hazards and adopt steps required to ensure safety.
- 1.4 Check with supervisor/appropriate person if requirements are not in accordance with usual practice.
2. Conduct pre-start checks as required.
- 2.1 Check safety gates and guards are in position and working.
- 2.2 Check moulds, closures and fittings to procedures.
- 2.3 Check moulds for cracks, chips, marks and cleanliness.
- 2.4 Check pre-preg materials and other raw materials are correct.
- 2.5 Undertake other pre-start checks in accordance with procedures.
3. Operate equipment.
- 3.1 Start equipment safely and correctly when required.
- 3.2 Check process is within required limits.
- 3.3 Collect products and store as required.
- 3.4 Check product/process is in specification/to required quality standard.
- 3.5 Maintain supply of material(s) as required.
- 3.6 Complete logs and records when required.
- 3.7 Collect and reprocess/discard scrap/trim, waste and other materials in accordance with procedures.
- 3.8 Clean up equipment and work area in accordance with procedures.
- 3.9 Pause or stop equipment in an emergency, following workplace and emergency procedures.
4. Respond to routine problems to procedures.
- 4.1 Recognise known faults that occur during the operation.
- 4.2 Identify and take action on causes of routine faults.
- 4.3 Log problems as required.
- 4.4 Identify non-routine process and quality problems and take appropriate action.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This competency applies to the operation of equipment using pre-preg materials to manufacture composite products. It includes moulds, equipment and programmable logic controllers (PLCs) if fitted.
Processes using pre-preg materials may include vacuum bagging or other closed mould processes.
It includes the operation of all relevant additional equipment where that equipment is integral to the process.
Procedures
All operations are performed in accordance with procedures.
Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards.
Tools and equipment
This competency includes use of equipment and tools such as:
moulds
moulding equipment and closures controllers, such as PLCs if fitted
hand tools used in the this process
material loading equipment used for loading of raw materials
relevant personal protective equipment.
Hazards
Typical hazards include:
spills
dusts/vapours
slip and fall
temperature
hazardous substances
moving equipment
manual handling hazards.
Problems
'Respond to routine problems' means 'apply known solutions to a limited range of predictable problems'. Typical process problems may include:
equipment malfunction
poor handling or storage of pre-preg materials
pre-preg incorrectly applied to mould
variations in process conditions, especially temperature
variations affecting cure rate
variations in materials or contamination of materials
equipment, tool or mould damage
incorrect quantity of materials
contaminated materials/additives
equipment faults
mould damage
wrong raw materials/additives
incorrect quantity of materials/additives
machine failure.
Typical product problems may include:
routine product faults
machine malfunction
mould/tooling problems
variations in materials and/or contamination of materials.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This competency applies to the operation of equipment using pre-preg materials to manufacture composite products. It includes moulds, equipment and programmable logic controllers (PLCs) if fitted.
Processes using pre-preg materials may include vacuum bagging or other closed mould processes.
It includes the operation of all relevant additional equipment where that equipment is integral to the process.
Procedures
All operations are performed in accordance with procedures.
Procedures include all relevant workplace procedures, work instructions, temporary instructions and relevant industry and government codes and standards.
Tools and equipment
This competency includes use of equipment and tools such as:
moulds
moulding equipment and closures controllers, such as PLCs if fitted
hand tools used in the this process
material loading equipment used for loading of raw materials
relevant personal protective equipment.
Hazards
Typical hazards include:
spills
dusts/vapours
slip and fall
temperature
hazardous substances
moving equipment
manual handling hazards.
Problems
'Respond to routine problems' means 'apply known solutions to a limited range of predictable problems'. Typical process problems may include:
equipment malfunction
poor handling or storage of pre-preg materials
pre-preg incorrectly applied to mould
variations in process conditions, especially temperature
variations affecting cure rate
variations in materials or contamination of materials
equipment, tool or mould damage
incorrect quantity of materials
contaminated materials/additives
equipment faults
mould damage
wrong raw materials/additives
incorrect quantity of materials/additives
machine failure.
Typical product problems may include:
routine product faults
machine malfunction
mould/tooling problems
variations in materials and/or contamination of materials.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.
Overview of assessment
A holistic approach should be taken to the assessment.
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria and skills and knowledge.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence is demonstrated in the knowledge and skills defined in this unit. These may include the ability to:
recognise the importance of material properties and qualities
apply approved procedures
take appropriate action to resolve faults or report faults to appropriate personnel
explain and implement emergency shutdown procedures.
Consistent performance should be demonstrated. For example, look to see that:
production standards are met consistently
upstream and down stream communication is timely and effective
operating procedures and work instructions are read and interpreted correctly
problems are identified and appropriate action is taken (ie the problem is fixed or reported)
all safety procedures are followed.
Assessment method and context
Assessment will occur using industrial pre-preg on industrial equipment and will be undertaken in a work like environment.
Competence in this unit may be assessed:
by using an appropriate, industrial moulding machine
in a situation allowing for the generation of evidence of the ability to respond to problems
by using a suitable simulation and/or a range of case studies/scenarios
through a combination of these techniques.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge and theoretical assessment will be combined with appropriate practical/simulation or similar assessment. Assessors need to be aware of any cultural issues that may affect responses to questions.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Specific resources for assessment
This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent that they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Overview of assessment
A holistic approach should be taken to the assessment.
Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria and skills and knowledge.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence is demonstrated in the knowledge and skills defined in this unit. These may include the ability to:
recognise the importance of material properties and qualities
apply approved procedures
take appropriate action to resolve faults or report faults to appropriate personnel
explain and implement emergency shutdown procedures.
Consistent performance should be demonstrated. For example, look to see that:
production standards are met consistently
upstream and down stream communication is timely and effective
operating procedures and work instructions are read and interpreted correctly
problems are identified and appropriate action is taken (ie the problem is fixed or reported)
all safety procedures are followed.
Assessment method and context
Assessment will occur using industrial pre-preg on industrial equipment and will be undertaken in a work like environment.
Competence in this unit may be assessed:
by using an appropriate, industrial moulding machine
in a situation allowing for the generation of evidence of the ability to respond to problems
by using a suitable simulation and/or a range of case studies/scenarios
through a combination of these techniques.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge and theoretical assessment will be combined with appropriate practical/simulation or similar assessment. Assessors need to be aware of any cultural issues that may affect responses to questions.
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Specific resources for assessment
This section should be read in conjunction with the Range Statement for this unit of competency. Resources required include suitable access to an operating plant or equipment that allows for appropriate and realistic simulation. A bank of case studies/scenarios and questions will also be required to the extent that they form part of the assessment method. Questioning may take place either in the workplace, or in an adjacent, quiet facility such as an office or lunchroom. No other special resources are required.
Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C5651 | PMBPROD298A | Operate equipment using pre-preg material | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAI84 | PMBPROD298 | Operate equipment using pre-preg material | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W245 | MEM40105 | Certificate IV in Engineering | Qualification |
| W233 | MEM20105 | Certificate II in Engineering | Qualification |
| W247 | MEM50105 | Diploma of Engineering - Advanced Trade | Qualification |
| W236 | MEM30105 | Certificate III in Engineering - Production Systems | Qualification |
| W234 | MEM20205 | Certificate II in Engineering - Production Technology | Qualification |
| W399 | PMB20107 | Certificate II in Polymer Processing | Qualification |
| W400 | PMB30107 | Certificate III in Polymer Processing | Qualification |
| W401 | PMB40107 | Certificate IV in Polymer Technology | Qualification |