Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Find and repair rail signalling system faults

Find and repair rail signalling system faults

Unit of competency
National Code
UEERS0004
State Code
OBX88
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to find and repair rail signalling system faults.It includes preparing to find and repair signalling system faults, using appropriate fault-finding techniques, repairing or rectifying faults and completing reporting requirements.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to find and repair rail signalling system fault/s
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
  • 1.2 Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
  • 1.3 Safety hazards that have not previously been identified are documented on job safety assessments, risks are assessed, and control measures determined and implemented in consultation with appropriate person/s
  • 1.4 Appropriate person/s is consulted to determine the nature and scope of the fault/s and to coordinate effectively with others affected by the fault/s
  • 1.5 Likely causes of the fault/s and order of probability are determined from system data and historical trends
  • 1.6 Impact of the fault on system is ascertained and appropriate person/s notified in accordance with workplace procedures
  • 1.7 Materials needed to find and repair the fault are obtained in accordance with workplace procedures and checked against job specifications
  • 1.8 Tools, equipment and testing devices needed to find and repair the fault/s are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.9 Circuits/equipment are inspected and checked as being isolated, where necessary, in strict accordance with operational procedures and WHS/OHS requirements
2 Find and repair rail signalling system faults
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out work are followed
  • 2.2 Signalling system performance parameters/standards are applied to appropriate fault-finding techniques
  • 2.3 Inspection and tests are conducted to determine the type and location of fault/s
  • 2.4 Wiring system is visually inspected for physical damage or installation defects, as required
  • 2.5 Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes
  • 2.6 Ongoing inspections and checks of the signalling system are undertaken to confirm the continued rectification of the fault
  • 2.7 Fault/s are located and identified efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
  • 2.8 Signalling system faults are rectified in accordance with workplace procedures
3 Complete repair/s to rail signalling system
  • 3.1 WHS/OHS risk control measures and workplace procedures for carrying out work are followed
  • 3.2 Unresolved faults are reported to appropriate person/s for further action in accordance with workplace procedures
  • 3.3 Inspection and test results, actions taken or recommended are documented and appropriate person/s notified in accordance with workplace procedures
  • 3.4 Component fault/s, test result/s, authorisation/s and permit/s documentation are completed to provide an accurate database and facilitate follow-up action and relevant reports
No information
No information
Replaces
State Code National Code Title Type
WC737 UEENEEN118A Find and repair rail signalling system faults Unit of competency
Replaced By
State Code National Code Title Type
OFE02 UEERS0022 Find and repair rail signalling system faults Unit of competency
State Code National Code Title Type
BFO2 UEE41220 Certificate IV in Electrical - Rail Signalling Qualification