Unit of competency Outline
Date retreived
23/07/2026 3:38 AM AWST
23/07/2026 3:38 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct aggregate spreader box operations
Conduct aggregate spreader box operations
Unit of competency
National Code
RIICBS204A
RIICBS204A
State Code
WB015
WB015
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/08/2012
Field of Education
030717 - Plant And Machine Operations
Original Release Date
31/08/2012
Nominal Hours
16
Description
This unit covers the conduct of aggregate spreader box operations in the civil construction industry. It includes planning and preparing, setting up and disconnecting the spreader box, spreading aggregate, performing hand spreading and spotting duties, and cleaning up Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare
- 1.1. Access, interpret and apply compliance documentation relevant to the work activity
- 1.2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3. Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4. Place cut on/cut off paper in preparation for bitumen spraying and at the end of the spray run
- 1.5. Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.6. Identify, confirm and apply environmental protection requirements from the project environmental management plan
2. Set up and disconnect spreader box
- 2.1. Connect equipment to the truck in accordance with the manufacturer's and site requirements prior to operation
- 2.2. Set spreader box to required width
- 2.3. Check spreader box operation to ensure correct operation
- 2.4. Check spreader box calibration as conforming to job specifications
- 2.5. Disconnect spreader box after operation in accordance with manufacturer's recommended procedures
- 2.6. Check truck to ensure that it is completely free of spreader and the spreader has all connecting parts correctly positioned for transportation or further use
3. Spread aggregate
- 3.1. Establish communication with the truck driver
- 3.2. Check and record size of aggregate prior to spreading
- 3.3. Remove cut on/cut off paper in preparation for aggregate spreading
- 3.4. Coordinate opening and closing of the spreader box accurately with speed and application of aggregate
- 3.5. Instruct driver to adjust speed, line or angle of body as required to suit operations
- 3.6. Monitor spread rate and make adjustments to ensure aggregate is spread to specifications
- 3.7. Complete spreading within specifications
4. Perform hand spreading and spotting duties
- 4.1. Check and correct uniformity of run as required
- 4.2. Use correct hand spreading method to specifications
5. Clean up
- 5.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan
- 5.2. Clean, check, maintain and store plant, tools and equipment
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Site locations may include:
car parks
airport runways
container yards
hard stands
footpaths
bikeways
roadways
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
manual spreader boxes
remote controlled spreader boxes (preferred method)
shovels
hand brooms
drag brooms
measuring equipment
calibration test equipment
ride on spreader boxes
spreader boxes with rollers
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Spreader box operation may include:
box is securely in place
there is no spillage over side of box or tailgate
gates work smoothly
aggregate flows smoothly
Aggregate spreading is to be:
applied on a sprayed bituminous material
Monitor may include:
spreading started and finished on cut on/cut off paper
correct speed
adjustment of tray angle to ensure smooth flow of aggregate
correct line followed
aggregate spread at a uniform rate
stones do not bounce or scatter
over spreading or under spreading is corrected
over spread and under spread areas are identified and repaired
blockages in spreader are cleared quickly or truck directed off spreading area
areas where sprayer has missed marked and reported
Materials may include:
aggregate
cut on/cut off paper
sprayed seal including seals, primers seals and emulsion seals including gritting of primes, bleeding seals and rack in seals
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Site locations may include:
car parks
airport runways
container yards
hard stands
footpaths
bikeways
roadways
Traffic conditions may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
buildings
parking sites
pedestrian areas
Tools and equipment may include:
manual spreader boxes
remote controlled spreader boxes (preferred method)
shovels
hand brooms
drag brooms
measuring equipment
calibration test equipment
ride on spreader boxes
spreader boxes with rollers
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Spreader box operation may include:
box is securely in place
there is no spillage over side of box or tailgate
gates work smoothly
aggregate flows smoothly
Aggregate spreading is to be:
applied on a sprayed bituminous material
Monitor may include:
spreading started and finished on cut on/cut off paper
correct speed
adjustment of tray angle to ensure smooth flow of aggregate
correct line followed
aggregate spread at a uniform rate
stones do not bounce or scatter
over spreading or under spreading is corrected
over spread and under spread areas are identified and repaired
blockages in spreader are cleared quickly or truck directed off spreading area
areas where sprayer has missed marked and reported
Materials may include:
aggregate
cut on/cut off paper
sprayed seal including seals, primers seals and emulsion seals including gritting of primes, bleeding seals and rack in seals
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting aggregate spreader box operations
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of conduct of aggregate spreader box operations
working with others to conduct aggregate spreader box operations that meets all of the required outcomes
consistent timely completion of aggregate spreader box operations that safely, effectively and efficiently meets the required outcomes
a minimum of four transverse paper joints are placed, picked up and disposed of
a minimum of six truck loads of at least two different aggregate are spread to the design application rate. It must include three runs of wings, tapers and turning lanes on at least three sites varying in complexity
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete aggregate spreader box operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting aggregate spreader box operations
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of conduct of aggregate spreader box operations
working with others to conduct aggregate spreader box operations that meets all of the required outcomes
consistent timely completion of aggregate spreader box operations that safely, effectively and efficiently meets the required outcomes
a minimum of four transverse paper joints are placed, picked up and disposed of
a minimum of six truck loads of at least two different aggregate are spread to the design application rate. It must include three runs of wings, tapers and turning lanes on at least three sites varying in complexity
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate's:
working with others to undertake and complete aggregate spreader box operations
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2043 | BCCBS2004B | Conduct aggregate spreader box operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH049 | RIICBS204D | Conduct aggregate spreader box operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D796 | RII30912 | Certificate III in Civil Construction | Qualification |