Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install off-grid power conversion equipment to electrical installation
Install off-grid power conversion equipment to electrical installation
Unit of competency
National Code
UEERE0079
UEERE0079
State Code
OET95
OET95
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
16/03/2023
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
16/03/2023
Nominal Hours
27
Description
This unit involves the skills and knowledge required to install off-grid power conversion equipment to electrical installation.It includes preparing to work on off-grid systems, installing off-grid system to electrical installation, and completing and reporting on installation activities.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations, which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, is required.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to install off-grid power conversion equipment to electrical installation
- 1.1 Nature of the installation is verified from design documentation and any design concerns identified referred to designer
- 1.2 WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
- 1.3 WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work
- 1.4 System installation is planned in consultation with others impacted by the work and sequenced appropriately
- 1.5 Location of system components is verified according to design within the constraints of the building structure and regulations
- 1.6 Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
- 1.7 Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures
2 Install off-grid power conversion equipment to electrical installation
- 2.1 Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
- 2.2 System components are installed to comply with design, manufacturer specifications, industry standards and regulatory requirements
- 2.3 Wiring is terminated at system components and mandatory tests conducted prior to energisation
- 2.4 Quality checks of installed apparatus are conducted in accordance with workplace procedures
- 2.5 System is programmed in accordance manufacturer specifications and design
- 2.6 Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
- 2.7 Worksite is cleaned and made safe in accordance with workplace procedures
- 2.8 ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| BIV5 | UEE43322 | Certificate IV in Electrical - Renewable Energy | Qualification |
| AF134 | UEESS00198 | Hybrid Photovoltaic, Wind and Battery Storage Systems Installer Skill Set | Skill set |
| AF119 | UEESS00199 | Micro-hydro Systems Designer Installer Skill Set | Skill set |
| AF132 | UEESS00201 | Micro-hydro Systems Installer Skill Set | Skill set |
| AF117 | UEESS00205 | Off-grid Photovoltaic/Generating Set Systems Designer-Installer Skill Set | Skill set |
| AF122 | UEESS00206 | Off-grid Photovoltaic/Generating Set Systems Installer Skill Set | Skill set |
| BIV3 | UEE50722 | Diploma of Renewable Energy Engineering | Qualification |
| AF124 | UEESS00217 | Wind Energy Systems Designer-Installer Skill Set | Skill set |
| AF114 | UEESS00219 | Wind Energy Systems Installer Skill Set | Skill set |