Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Assemble and install shopfront structures
Assemble and install shopfront structures
Unit of competency
National Code
CPCSHP3003
CPCSHP3003
State Code
OCM28
OCM28
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
030113 - Cabinet Making
Original Release Date
01/06/2021
Nominal Hours
40
Description
This unit of competency specifies the skills and knowledge required to assemble and install internal and external prefabricated components, sections and fittings, which form the bulkheads and shopfront structure opening on to a street or shopping centre walkway. It includes assembling and installing shopfronts to new or existing premises.It applies to shopfitters responsible for receiving, assembling and installing shopfronts. Individuals at this level take responsibility for organising and completing these tasks with a high degree of self-direction.Licensing, legislative or certification requirements may apply to this unit of competency in some states and territories. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.Completion of the general construction induction training program, specified in the Safe Work Australia modelCode of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industrymeets this requirement.
Notes
Elements and Performance Criteria
1 Plan for the work.
- 1.1 Read and interpret job requirements in conjunction with shopfitting plans and specifications.
- 1.2 Identify and apply organisational quality procedures and processes.
- 1.3 Inspect onsite conditions and identify and report hazards and implement risk control measures.
- 1.4 Determine job priorities and sequence job tasks in consultation with others in the workplace.
- 1.5 Select, fit and use personal protective equipment (PPE).
- 1.6 Select tools, equipment and plant required for the job, check for serviceability, rectify and report faults.
- 1.7 Receive delivered shopfront components, sections and fittings, check for completeness and report any shortages or damaged materials to appropriate person.
2 Prepare for installation.
- 2.1 Check datum, shopfront opening dimensions and levels against construction plan.
- 2.2 Check and compare overall shopfront structure dimensions with installation specifications.
- 2.3 Identify lease line and boundary from certified construction plans and confirm with building contractor or relevant person.
- 2.4 Remove protrusions, and identify and rectify shopfront opening irregularities and dimensions, and check for plumb and level.
- 2.5 Prepare suitable packing for level and plumb.
- 2.6 Check location of services, prepared supports and bracing for shopfront structure installation.
3 Assemble and install shopfront structure.
- 3.1 Assemble components, fittings and pre-assembled frames and place into position in preparation for installation.
- 3.2 Raise bulkhead into position using mechanical lifting equipment and support, and brace shopfront structure.
- 3.3 Check and adjust shopfront structure for position, level, plumb and winding.
- 3.4 Anchor and secure shopfront structure using specified fixing methods.
- 3.5 Fit doors, door furniture and closures and ensure that they operate freely.
- 3.6 Scribe fillers and seal remaining gaps with approved sealant.
- 3.7 Measure, compile and send glazing order to appropriate person.
4 Clean up.
- 4.1 Remove excess sealant and clean shopfront of marks, masking tape and protective layers.
- 4.2 Clear work area and dispose of, reuse or recycle materials following workplace and environmental requirements.
- 4.3 Store and secure tools and equipment following workplace procedures.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BBB04 | CPCCSH3003 | Assemble and install shopfront structures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGD2 | CPC30120 | Certificate III in Shopfitting | Qualification |