Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Line tunnels
Line tunnels
Unit of competency
National Code
RIICTC302E
RIICTC302E
State Code
OCX54
OCX54
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
68
Description
This unit describes the skills and knowledge required to line tunnels in civil construction, including drilling and installing rock bolts, applying reinforcing mesh and shotcreting the tunnel face. It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to line tunnel
- 1.1 Obtain, interpret, clarify and confirm work instructions
- 1.2 Access, interpret and apply documentation required to line tunnels and confirm work activity is compliant
- 1.3 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
- 1.4 Select equipment and tools required for work activities and check for faults
- 1.5 Select and wear personal protective equipment according to site requirements
- 1.6 Identify and address potential risks, hazards and environmental issues, and implement control measures within scope of own role
- 1.7 Obtain and interpret emergency procedures and identify steps required to respond to emergencies
2. Prepare tunnel face for shotcrete
- 2.1 Install rock anchors and bolts as required to designed locations
- 2.2 Prepare reinforcing mesh according to tunnel shape and designed lining, where specified
- 2.3 Locate and secure reinforcing mesh in place according to job requirements
- 2.4 Fix dowels to wall face to provide depth gauge to thickness of concrete or shotcrete
- 2.5 Install drainage to the tunnel roof and walls according to job requirements
3. Shotcrete tunnel face
- 3.1 Set up pump, pipelines and spray equipment and confirm serviceability and operation
- 3.2 Prepare and control shotcrete mix according to job requirements
- 3.3 Operate pump according to job requirements
- 3.4 Prepare formwork and set to specifications
- 3.5 Provide support to shotcreter in monitoring supply and assist with elevated platform and allied equipment
- 3.6 Apply shotcrete according to job requirements
4. Conduct clean-up activities
- 4.1 Clear work area and dispose of or recycle materials according to site requirements
- 4.2 Clean, check, perform maintenance on and store plant, tools and equipment according to manufacturer specifications and site requirements
- 4.3 Carry out housekeeping activities according to site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH176 | RIICTC302D | Line tunnel | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGL0 | RII30920 | Certificate III in Civil Construction | Qualification |