Unit of competency Outline
Date retreived
22/07/2026 12:46 AM AWST
22/07/2026 12:46 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate LV distribution network demand
Coordinate LV distribution network demand
Unit of competency
National Code
UETTDRSO13B
UETTDRSO13B
State Code
WA555
WA555
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
13/04/2010
Field of Education
031301 - Electrical Engineering
Original Release Date
13/04/2010
Nominal Hours
100
Description
1) 1.1) DescriptorThis Competency Standard Unit covers the coordination of the switching of LV distribution network components with due regard to the loadings and prevailing network constraints and may include scheduling of generators, VAR compensators, load shedding and non-essential loads in response to NEMMCO or network requirements. It also includes voltage control equipment.
Notes
Elements and Performance Criteria
1 Plan for the coordination of LV distribution network demand
- 1.1 OHS practices/procedures and environmental and sustainable energy procedures, which may influence the coordination of LV Distribution network demand systems, are reviewed and determined.
- 1.2 Purpose of the coordination of the network demand is established after data is analysed and expected outcomes of the work are confirmed with the appropriate personnel.
- 1.3 Organisational established procedures on policies and specifications for the coordination of the network demand are obtained or established with the appropriate personnel.
- 1.4 Testing procedures are discussed with/directed to the appropriate personnel in order to ascertain the project brief.
- 1.5 Testing parameters are established from organisational established procedures on policies and specifications.
- 1.6 Equipment/tools and personal protective equipment are selected based on specified Performance Criteria and established procedures.
- 1.7 Work roles and tasks are allocated according to requirements and individuals' competencies.
- 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures.
- 1.9 Liaison and communication issues with other/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work.
- 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule.
- 1.11 Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures.
2 Carry out the coordination of LV distribution network demand
- 2.1 Circuit/systems modelling are used to evaluate alternative proposals as per established procedures.
- 2.2 OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures.
- 2.3 Coordination decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures.
- 2.4 Mathematical and/or engineering models of the coordination process are used to analyse the effectiveness of the finished project as per requirements and established procedures.
- 2.5 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures.
- 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements.
- 2.7 Testing of the coordination process is undertaken according to requirements and established procedures.
- 2.8 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures.
- 2.9 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements.
- 2.10 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards.
- 2.11 Strategic plans are developed incorporating organisation initiatives as per established procedures.
3 Complete the coordination of LV distribution network demand
- 3.1 Final review of the coordination process is undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the project.
- 3.2 Appropriate personnel are notified of completion and reports and/or completion documents are finalised/commissioned.
- 3.3 Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval.
- 3.4 Approved copies of managed LV Distribution network demand documents are issues and records are updated in accordance with established procedures.
RANGE STATEMENT
8) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
This Competency Standard Unit shall/may be demonstrated in relation to the coordination of a switching of LV distribution network components with due regard to the loadings and prevailing network constraints and shall/may be demonstrated using the following:
LV distribution feeders/distribution network; transformers or regulators with LV windings; LV busbars; LV isolators ; LV switchgear (applicable to enterprise equipment); generation that interconnects with the LV network; VAR compensation devices that interconnect with the LV network; switching instructions (applicable to enterprise equipment); computers (applicable to enterprise equipment); network diagrams (applicable to enterprise equipment).
The following constants and variables included in the Element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:
Appropriate and relevant persons (see Personnel)
Appropriate authorities
Appropriate work platform
Assessing risk
Assessment
Authorisation
Confined space
Diagnostic, testing and restoration
Documenting detail work events, record keeping and or storage of information
Drawings and specifications
Emergency
Environmental and sustainable energy procedures
Environmental legislation
Environmental management documentation
Established procedures
Fall prevention
Hazards
Identifying hazards
Inspect
Legislation
MSDS
Notification
OHS practices
OHS issues
Permits and/or permits to work
Personnel
Quality assurance systems
Requirements
Testing procedures
Work clearance systems
8) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
This Competency Standard Unit shall/may be demonstrated in relation to the coordination of a switching of LV distribution network components with due regard to the loadings and prevailing network constraints and shall/may be demonstrated using the following:
LV distribution feeders/distribution network; transformers or regulators with LV windings; LV busbars; LV isolators ; LV switchgear (applicable to enterprise equipment); generation that interconnects with the LV network; VAR compensation devices that interconnect with the LV network; switching instructions (applicable to enterprise equipment); computers (applicable to enterprise equipment); network diagrams (applicable to enterprise equipment).
The following constants and variables included in the Element/Performance Criteria in this unit are fully described in the Definitions Section 1 of this volume and form an integral part of the Range Statement of this unit:
Appropriate and relevant persons (see Personnel)
Appropriate authorities
Appropriate work platform
Assessing risk
Assessment
Authorisation
Confined space
Diagnostic, testing and restoration
Documenting detail work events, record keeping and or storage of information
Drawings and specifications
Emergency
Environmental and sustainable energy procedures
Environmental legislation
Environmental management documentation
Established procedures
Fall prevention
Hazards
Identifying hazards
Inspect
Legislation
MSDS
Notification
OHS practices
OHS issues
Permits and/or permits to work
Personnel
Quality assurance systems
Requirements
Testing procedures
Work clearance systems
EVIDENCE GUIDE
9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the competency standard unit and the Training Package Assessment Guidelines.
The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.
Overview of Assessment
9.1)
Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry's preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be 'rich' in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its 'richness'. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.
Critical aspects of evidence required to demonstrate competency in this unit
9.2)
Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each Element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the "Assessment Guidelines - UET09". Evidence shall also comprise:
A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and
Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and
Demonstrate an understanding of the essential knowledge and associated skills described in this unit to such an extent that the learner's performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and
Demonstrate an appropriate level of employability skills; and
Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and
Demonstrated performance across a representative range of contexts from the prescribed items below:
Range of tools/equipment/materials/procedures/workplaces/other variables
Group No
The minimum number of items on which skill is to be demonstrated
Item List
A
Demonstrate at least three (3) coordinate of multiple simultaneous system manipulations that encompass the following:
LV distribution network
LV network manipulation to control loading on equipment
Transformers with LV windings (if applicable to enterprise equipment)
LV busbars
LV isolators
LV switchgear (applicable to enterprise equipment).
B
All of the following:
Writing switching instructions
Checking and review switching instructions
Coordinating multiple simultaneous switching instructions
Confirm line loading
Preparing and authorising LV distribution switching programs
Coordinate multiple switching processes
Coordinate the status of all access permits/authorities on LV network equipment relevant to the scope
Ensure network plant operates within design and regulatory requirements on a real time basis
Application and administration of SCADA or equivalent.
Analysis, diagnosis and reporting of system failure
Calculate and analyse paralleling conditions on the interconnected LV system.
C
Prepare, write and check switching sheets to:
Manage load
Manage voltage
Minimise loss
Maximise system reliability
Allow safe network access for maintenance activities
Allow safe network access for construction activities
Validating fault reports arising from system disturbances.
D
At least one occasion
Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.
Context of and specific resources for assessment
9.3)
This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual the coordination of LV distribution network demand.
Note:
Access will be needed to: relevant modelling tools, drawings, computerised electrical plant control and monitoring facilities and enterprise operational policies, procedures and work practices.
In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working in realistic environment and a variety of conditions.
Method of assessment
9.4)
This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 "Assessment Guidelines".
Note:Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.
Concurrent assessment and relationship with other units
9.5)
There are no concurrent assessment recommendations for this unit.
9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of the competency standard unit and the Training Package Assessment Guidelines.
The Evidence Guide forms an integral part of this Competency Standard Unit and shall be used in conjunction with all component parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.
Overview of Assessment
9.1)
Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry's preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and, Regulatory policy in this regard.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be 'rich' in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its 'richness'. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.
Critical aspects of evidence required to demonstrate competency in this unit
9.2)
Before the critical aspects of evidence are considered all prerequisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each Element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the "Assessment Guidelines - UET09". Evidence shall also comprise:
A representative body of Performance Criteria demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and range; and
Apply sustainable energy principles and practices as specified in the Performance Criteria and range; and
Demonstrate an understanding of the essential knowledge and associated skills described in this unit to such an extent that the learner's performance outcome is reported in accordance with the preferred approach; namely a percentile graded result, where required by the regulated environment; and
Demonstrate an appropriate level of employability skills; and
Conduct work observing the relevant Anti Discrimination legislation, regulations, policies and workplace procedures; and
Demonstrated performance across a representative range of contexts from the prescribed items below:
Range of tools/equipment/materials/procedures/workplaces/other variables
Group No
The minimum number of items on which skill is to be demonstrated
Item List
A
Demonstrate at least three (3) coordinate of multiple simultaneous system manipulations that encompass the following:
LV distribution network
LV network manipulation to control loading on equipment
Transformers with LV windings (if applicable to enterprise equipment)
LV busbars
LV isolators
LV switchgear (applicable to enterprise equipment).
B
All of the following:
Writing switching instructions
Checking and review switching instructions
Coordinating multiple simultaneous switching instructions
Confirm line loading
Preparing and authorising LV distribution switching programs
Coordinate multiple switching processes
Coordinate the status of all access permits/authorities on LV network equipment relevant to the scope
Ensure network plant operates within design and regulatory requirements on a real time basis
Application and administration of SCADA or equivalent.
Analysis, diagnosis and reporting of system failure
Calculate and analyse paralleling conditions on the interconnected LV system.
C
Prepare, write and check switching sheets to:
Manage load
Manage voltage
Minimise loss
Maximise system reliability
Allow safe network access for maintenance activities
Allow safe network access for construction activities
Validating fault reports arising from system disturbances.
D
At least one occasion
Dealing with an unplanned event by drawing on essential knowledge and associated skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items.
Context of and specific resources for assessment
9.3)
This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual the coordination of LV distribution network demand.
Note:
Access will be needed to: relevant modelling tools, drawings, computerised electrical plant control and monitoring facilities and enterprise operational policies, procedures and work practices.
In addition to the resources listed above, in Context of and specific resources for assessment, evidence should show demonstrated competency working in realistic environment and a variety of conditions.
Method of assessment
9.4)
This Competency Standard Unit shall be assessed by methods given in Volume 1, Part 3 "Assessment Guidelines".
Note:Competent performance with inherent safe working practices is expected in the Transmission, Distribution and Rail Traction Industry. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and associated skills described in this unit.
Concurrent assessment and relationship with other units
9.5)
There are no concurrent assessment recommendations for this unit.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD760 | UETTDRSO43A | Coordinate low voltage distribution network demand | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W724 | UET50109 | Diploma of ESI - Power Systems | Qualification |