Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan electrical installations with a low voltage demand up to 400 A per phase

Plan electrical installations with a low voltage demand up to 400 A per phase

Unit of competency
National Code
UEEEL0057
State Code
OCA02
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/11/2024
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to plan electrical installation with a low voltage (LV) demand up to 400 ampere (A) per phase.It includes planning, arranging and identifying resources for an electrical installation. It also includes arrangement of circuits; metering and control; cable route planning; specifying type and rating of switchgear, control gear, protection devices and wiring based on calculated and deemed-to-comply solutions and planning documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan electrical installation
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) risk control measures and workplace procedures for carrying out work are followed
  • 1.2 Nature of the electrical installation is determined from job specifications
  • 1.3 Safety and regulatory requirements for electrical installation are identified, obtained and applied in accordance with relevant industry standards and safe work practices
  • 1.4 Electricity tariffs required are discussed with appropriate person/s to determine control and metering needs of the installation
2 Arrange installation circuits, control and metering
  • 2.1 Circuits are arranged to ensure safe and functional operation of the installation in accordance with relevant industry standards
  • 2.2 Circuits are arranged in accordance with relevant industry standards and job specifications
  • 2.3 Control and metering of the installation are arranged in accordance with relevant industry standards and job specifications
  • 2.4 Earthing is arranged in accordance with relevant industry standards and energy supplier requirements
3 Identify cables protection and switchgear
  • 3.1 Fault levels at relevant point/s of the installation are determined from calculations and/or information from the energy supplier
  • 3.2 Wiring systems selected are confirmed as meeting sustainable energy practices and job specifications
  • 3.3 Cable conductor sizes are confirmed to meet current-carrying capacity requirements and voltage-drop and fault-loop impedance limitations and short circuit performance
  • 3.4 Protection methods and devices are identified to meet coordination requirements for overload and short circuit protection
  • 3.5 Switchgear and control gear are identified to meet fault levels, current voltage and ingress protection (IP) ratings and functional requirements
  • 3.6 Earthing system components are identified to meet requirements of the earthing system used
  • 3.7 Evidence is obtained that electrical equipment selected is in accordance with WHS/OHS and safe work practices
4 Document electrical installation plan
  • 4.1 Equipment identified for the installation is documented with supporting calculations in accordance with workplace procedures
  • 4.2 Electrical installation is documented in accordance with workplace procedures and forwarded to relevant person/s
No information
No information
Replaces
State Code National Code Title Type
WC483 UEENEEG125A Plan electrical installations with a low voltage demand up to 400 A per phase Unit of competency