Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Finish segmental paving

Finish segmental paving

Unit of competency
National Code
CPCCPA3004
State Code
OCQ36
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040399 - Building, N.e.c.
Original Release Date
01/06/2021
Nominal Hours
4
Description
This unit specifies the skills and knowledge required to finish paving work by setting pavers using a variety of materials. This unit applies to those who finish paving on external areas on new and existing sites. It is suitable for people operating with some autonomy. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without needing close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industrymeets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare the work.
  • 1.1 Select, fit correctly and use personal protective equipment (PPE) appropriate for job.
  • 1.2 Read, interpret and apply finish segmental paving requirements from current plans and specifications.
  • 1.3 Follow requirements in workplace safety and environmental documentation and workplace procedures.
  • 1.4 Use measurements and apply formulas to calculate material quantities.
  • 1.5 Determine job priorities and sequence job tasks in consultation with others on site.
  • 1.6 Select and check condition of equipment and tools and report any damage or faults to relevant person.
  • 1.7 Check conformity of materials against the specifications and place materials in in preparation for the work.
2 Set segmental pavers.
  • 2.1 Secure paved area with an edging course as specified.
  • 2.2 Set segmental pavers with specified material and compact.
  • 2.3 Repeat setting process as required to ensure joints are full.
  • 2.4 Check paving for chipped, cracked or damaged pavers and replace.
3 Clean up.
  • 3.1 Clear the work area, and dispose of, reuse or recycle materials following workplace and environmental requirements.
  • 3.2 Clean tools and equipment, check for serviceability and report damage or faults.
  • 3.3 Store and secure tools and equipment following workplace procedures.
No information
No information
Replaces
State Code National Code Title Type
W9439 CPCCPA3004A Finish segmental paving Unit of competency
State Code National Code Title Type
BGD8 CPC33020 Certificate III in Bricklaying and Blocklaying Qualification