Unit of competency Outline
Date retreived
22/07/2026 8:46 AM AWST
22/07/2026 8:46 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement and manage drainage system management plan
Implement and manage drainage system management plan
Unit of competency
National Code
NWP534B
NWP534B
State Code
D1982
D1982
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
080301 - Business Management
Original Release Date
06/11/2014
Nominal Hours
100
Description
This unit of competency describes the outcomes to implement and manage drainage systems, including system performance analysis, customer liaison and planning.
Notes
Elements and Performance Criteria
1Implement the drainage system management plan.
- 1.1 Confirm performance measures for the drainagesystem management plan.
- 1.2 Access and interpret historic system information to inform the implementation process.
- 1.3 Inform and educate stakeholders about the drainage system management plan.
- 1.4 Develop management plan components and activities for implementation.
- 1.5 Develop the implementation plan in conformance with legislative and organisational requirements.
- 1.6 Determine responsibilities and timelines for the implementation activities.
2Monitor and evaluate the operation and maintenance of the system.
- 2.1 Plan, perform and report monitoring and testing procedures to identify deviations of the system's performance from requirements and agreed service levels.
- 2.2 Evaluate maintenance budgets, activity programs and output target measures and identify, investigate and report deviations from targets.
- 2.3 Identify and record links between operational problems and maintenance activities.
3Report on implementation of the plan.
- 3.1 Review objectives of the management and implementation plans.
- 3.2 Make recommendations for changes to plan objectives and operational and maintenance procedures.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
The drainage system may include:
pipe and pumping systems
open drains
natural water courses
gross pollution traps
wetland treatment systems
stormwater outfalls
surface water run-off
stormwater attenuation structures
Historic system information may include:
metering records
previous studies
impact of weather
relevant hydrological information
previous system performance
previous flow rates and operational procedures
Stakeholders may include:
customers
government
industries
other water authorities
power utilities
employees
customer representative committees
Legislative requirements may include:
relevant federal legislation
relevant state or territory legislation
relevant local government by-laws
Australian Standards
Monitoring and testing may include:
flow
input and output quality
testing procedures
physical analysis of water
fauna and flora surveys
sampling locations
budgets
physical achievement targets
operational procedures
number of complaints
World Health Organisation standards
response time
customer satisfaction
The drainage system may include:
pipe and pumping systems
open drains
natural water courses
gross pollution traps
wetland treatment systems
stormwater outfalls
surface water run-off
stormwater attenuation structures
Historic system information may include:
metering records
previous studies
impact of weather
relevant hydrological information
previous system performance
previous flow rates and operational procedures
Stakeholders may include:
customers
government
industries
other water authorities
power utilities
employees
customer representative committees
Legislative requirements may include:
relevant federal legislation
relevant state or territory legislation
relevant local government by-laws
Australian Standards
Monitoring and testing may include:
flow
input and output quality
testing procedures
physical analysis of water
fauna and flora surveys
sampling locations
budgets
physical achievement targets
operational procedures
number of complaints
World Health Organisation standards
response time
customer satisfaction
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to implement and manage drainage system management plans including:
gathering, interpreting and synthesising information (including historical data, current legislation and standards, stakeholder views and the results of drainage system testing and monitoring) to underpin the implementation of the drainage system management plan
planning and implementing testing processes and programs
monitoring and evaluating the outcomes of the drainage system management plan
providing advice and communicate with stakeholders and users
preparing reports and recommendations for future action
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to implement and manage drainage system management plans including:
gathering, interpreting and synthesising information (including historical data, current legislation and standards, stakeholder views and the results of drainage system testing and monitoring) to underpin the implementation of the drainage system management plan
planning and implementing testing processes and programs
monitoring and evaluating the outcomes of the drainage system management plan
providing advice and communicate with stakeholders and users
preparing reports and recommendations for future action
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| D247 | NWP50107 | Diploma of Water Operations | Qualification |