Unit of competency Outline

Date retreived
22/07/2026 1:07 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Implement vessel planned maintenance system

Implement vessel planned maintenance system

Unit of competency
National Code
MARB4002A
State Code
WG369
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
06/06/2013
State Implementation and Classification
Approved Date
10/02/2014
Field of Education
031701 - Maritime Engineering
Original Release Date
10/02/2014
Nominal Hours
35
Description
This unit involves the skills and knowledge required to establish, organise and implement preventative and reactive maintenance programs to optimise vessel operational performance.
Notes
Elements and Performance Criteria
1 Develop maintenance plan
  • 1.1 Vessel and equipment specifications, service requirements and organisational procedures are checked for recommended maintenance intervals and processes according to the safety management system
  • 1.2 Special requirements for maintenance are separated from routine maintenance tasks
  • 1.3 Maintenance plan and a related work schedule are developed
  • 1.4 Procedures for safety checks of equipment are developed and documented according to organisational procedures
  • 1.5 Recordkeeping system is developed for maintenance work completed and equipment replaced according to organisational procedures
2 Establish maintenance systems
  • 2.1 Resource requirements are identified and supplied
  • 2.2 Roles and responsibilities of the crew are clarified and built into position descriptions and work instructions
  • 2.3 Mentoring and training is provided to support the maintenance strategy
  • 2.4 Maintenance procedures and schedules are prepared to minimise negative impacts on vessel operations, costs, waste and the environment
  • 2.5 Potential risks are analysed and management strategies recommended
  • 2.6 Contingency plans are prepared
  • 2.7 Maintenance schedules and procedures are effectively communicated to crew
3 Implement maintenance plan
  • 3.1 Consumables and equipment are coordinated to meet maintenance work schedule
  • 3.2 Maintenance work schedule is completed according to maintenance plan
  • 3.3 Technical assistance is provided to crew in completing maintenance activities as required
  • 3.4 Appropriate readings, measurements and recordings are made and compared to equipment and other relevant specifications
  • 3.5 Areas of vessel and equipment requiring further testing are identified and appropriate procedures for testing are implemented
  • 3.6 Appropriate adjustments to the maintenance plan are made based on experience and required documentation is completed
  • 3.7 Maintenance records are completed and forwarded to appropriate personnel
  • 3.8 Areas where changes to equipment operation or routine maintenance are required to maintain optimum work output and equipment life are noted
4 Monitor and review maintenance management system
  • 4.1 Continuous improvement strategies are developed
  • 4.2 Performance criteria for maintenance goals are determined and data collection strategies are established
  • 4.3 Performance information and outcomes are analysed and implications reported to appropriate personnel
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below.
Special requirements for maintenance may include:
Damage repair
Hatch cover watertight arrangements
Main engine or auxiliary machinery breakdowns
Replacing defective cargo lifting equipment
Routine maintenance tasks may include:
Back-ups
Changing user codes
Checks of cooling system, fuel, grease and oil, battery levels
Confirmation of operational effectiveness
Dismantling and assembling
Identification and replacement of worn parts
Inspections of fan belts, leads, lines, connections, air filters, hydraulics, lighting
Minor adjustments
Testing
Resource requirements may include:
Materials
Personnel
Tools and equipment
Training
Maintenance strategy may include:
Cleaning
Electrical
Emergency lighting
Evacuation
Housekeeping
Painting
Pests
Plumbing
Security
Potential risks may include:
Working at heights
Working in confined spaces
Working overside
Dealing with hazardous material
Hot work
Maintenance goals may include:
Changes in attitudes
Costs
Frequency of breakdowns
Length of time out of action
Time of repairs
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, the required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the Elements, Performance Criteria, Required Skills, Required Knowledge and include:
developing effective planning documents
ensuring currency of relevant legislative and regulatory knowledge.
Context of and specific resources for assessment
Performance is demonstrated consistently over time and in a suitable range of contexts.
Resources for assessment include access to:
industry-approved marine operations site where implementing a vessel planned maintenance system may be conducted
tools, equipment and personal protective equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities
range of relevant exercises, case studies and/or other simulated practical and knowledge assessments
appropriate range of relevant operational situations in the workplace.
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals.
Method of assessment
Practical assessment must occur in an:
appropriately simulated workplace environment and/or
appropriate range of situations in the workplace.
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate to this unit:
direct observation of the candidate implementing a vessel planned maintenance system
direct observation of the candidate applying relevant WHS/OHS requirements and work practices.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
In all cases where practical assessment is used it should be combined with targeted questioning to assess Required Knowledge.
Assessment processes and techniques must be appropriate to the language and literacy requirements of the work being performed and the capacity of the candidate.
Replaced By
State Code National Code Title Type
AWK92 MARB018 Implement vessel planned maintenance system Unit of competency
State Code National Code Title Type
J558 MAR40113 Certificate IV in Maritime Operations (Chief Integrated Rating) Qualification