Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Maintain timber, laminate and engineered flooring
Maintain timber, laminate and engineered flooring
Unit of competency
National Code
MSFFL3041
MSFFL3041
State Code
WI398
WI398
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040321 - Floor Coverings
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers preparing and implementing maintenance systems to maintain timber, laminate and engineered flooring. The maintenance plan must be cost-effective, environmentally sensitive and specific to floor type and location. Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Prepare maintenance plan
- 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to flooring maintenance requirements are verified and complied with
- 1.2 Instructions or plans are read and interpreted to identify process required to complete work tasks
- 1.3 Maintenance requirements for timber, laminate and engineered flooring are identified from relevant information sources
- 1.4 Maintenance costs are identified and quantified
- 1.5 Maintenance requirements are checked against warranty, insurance agreements and indemnity provisions
- 1.6 Maintenance plan is developed to promote and sustain performance and production systems in line with enterprise requirements
- 1.7 Effective workplace communication strategies are established with regard to maintenance plan, environmental and WHS policies, and enterprise requirements
2 Implement maintenance plan
- 2.1 Tools, equipment and materials are selected and checked prior to use
- 2.2 Resource and supply requirements are identified, secured and included in enterprise budgets and operational considerations
- 2.3 Prepared maintenance schedules and procedures are effectively communicated to customers, staff, contractors and suppliers to minimise negative impacts on maintenance systems and costs
- 2.4 Maintenance plans and work sequences are implemented and scheduled to minimise disruption to customer operations
- 2.5 Potential risks/hazards are assessed with regard to staff and supply problems, and contingency plans prepared accordingly
- 2.6 Timber, laminate and engineered flooring are maintained to manufacturer specifications, WHS and enterprise requirements
3 Monitor maintenance plan
- 3.1 Maintenance activities and performance are monitored against maintenance plan for efficiency and effectiveness
- 3.2 Workplace hazards and environmental implications associated with maintenance procedures are monitored and controlled in line with WHS and customer requirements
- 3.3 Costs are monitored and controlled within maintenance system budget requirements
- 3.4 Relevant information with regard to the maintenance plan is documented in accordance with customer requirements
- 3.5 Timber, laminate and engineered flooring are maintained in clean and safe operational condition
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8591 | LMFFL3513A | Maintain timber, laminate and engineered flooring | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAJ40 | MSFFL3087 | Plan and implement maintenance systems for timber, laminate and engineered flooring | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J736 | MSF30813 | Certificate III in Flooring Technology | Qualification |