Unit of competency Outline

Date retreived
22/07/2026 3:19 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Collect spatial data using a total station

Collect spatial data using a total station

Unit of competency
National Code
CPPSSI4040
State Code
OCV18
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
13/01/2021
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
031199 - Geomatic Engineering, N.e.c.
Original Release Date
01/06/2021
Nominal Hours
65
Description
This unit specifies the skills and knowledge required to collect spatial data using a total station. It includes identifying control marks, equipment set-up and operation as well as data validation, correction and adjustments using industry-accepted methods to achieve required accuracy range. This unit is suitable for entry-level technicians who use a broad range of cognitive, technical and communication skills to select and apply a range of methods, tools, materials and information to complete routine and non-routine activities and provide and transmit solutions to a variety of predictable and sometimes unpredictable problems. Surveying and spatial information skills are applied in a range of industry contexts, including town planning, civil construction, mining, engineering, health, agriculture and defence.All work must be carried out to comply with workplace procedures, in accordance with relevant state/territory regulations that govern surveying work, as well as work health and safety (WHS) legislation and regulations that apply to the workplace.Cadastral surveying must be undertaken under the supervision of a registered surveyor. Users must check with the relevant regulatory state/territory authority before delivery. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for spatial data collection.
  • 1.1 Review project specifications, information and control marks and plan surveying tasks in consultation with appropriate persons.
  • 1.2 Check site conditions to identify factors that could impact on operation of equipment.
  • 1.3 Identify optimum equipment positions to improve accuracy and precision of measurements.
  • 1.4 Comply with legislative and organisational requirements for workplace safety.
2 Operate total station.
  • 2.1 Set up and check equipment according to manufacturer specifications.
  • 2.2 Interpret equipment software menus and configurations and collect required spatial data and related attributes.
  • 2.3 Measure identified survey components and reduce data according to job specifications.
  • 2.4 Perform surveying calculations relating to height, distances, angles, bearings and coordinates
  • 2.5 Measure and calculate basic spatial data based on control marks with known coordinates heights.
  • 2.6 Validate and record legible measurements and computations according to job specifications and data collection plan.
3 Finalise spatial data collection.
  • 3.1 Check and validate accuracy of spatial data by applying industry-accepted standards and procedures.
  • 3.2 Take additional measurements where required and make adjustments to data to correct errors.
  • 3.3 Download data and complete project documentation according to organisational requirements.
  • 3.4 Store and file data in accordance with organisational and legislative requirements.
No information
No information
Replaces
State Code National Code Title Type
AXH50 CPPSIS4040 Collect spatial data using terrestrial technologies Unit of competency
State Code National Code Title Type
BGI7 CPP41721 Certificate IV in Surveying and Spatial Information Services Qualification