Unit of competency Outline

Date retreived
23/07/2026 2:00 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain vital relay interlocking systems

Install and maintain vital relay interlocking systems

Unit of competency
National Code
UEERS0014
State Code
OBX74
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to install/maintain vital relay interlocking systems in a rail network.It includes preparing and installing/maintaining vital relay interlocking system. It also includes completing the installation/maintenance of vital relay interlocking system, repairing system faults, performing operational tests and reporting requirements.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to install/maintain vital relay interlocking system
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
  • 1.2 Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
  • 1.3 Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements
  • 1.4 Appropriate rail safe working person/s is consulted to ensure work is coordinated effectively with others to minimise traffic disruptions
  • 1.5 Materials needed for installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications
  • 1.6 Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
2 Install/maintain vital relay interlocking system
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2 Visual inspection of installation wiring and equipment is carried out to identify damaged or faulty equipment
  • 2.3 Damaged or faulty component/s identified during inspection is replaced in accordance with technical instructions, manufacturer specifications and workplace maintenance procedures
  • 2.4 Installation/maintenance is performed efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
  • 2.5 Systems are investigated using appropriate fault-finding and diagnostic techniques to identify faults
  • 2.6 Fault circuit indicators and maintenance records are used to assist in the identification of electrical faults
  • 2.7 Repairs, replacement and/or adjustment of equipment/systems are carried out using appropriate tools and test equipment to ensure equipment/systems function to relevant technical and operational standards
  • 2.8 Faulty, worn, damaged or insecure components are repaired/replaced or secured whilst ensuring system safety integrity is maintained in accordance with technical and/or manufacturer specifications
  • 2.9 Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
  • 2.10 Vital relay interlocking system is inspected and tested in accordance with workplace test procedures and relevant equipment is used to ensure it operates within specified technical parameters
3 Complete vital relay interlocking system installation/maintenance
  • 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2 Reusable, faulty and worn components are tagged and despatched for repair in accordance with workplace procedures
  • 3.3 Maintenance work activities are recorded in accordance with workplace procedures and organisation requirements
  • 3.4 Documentation, including component faults test results, authorisations and permits, is completed to provide an accurate database and facilitate follow-up action and relevant reports produced
No information
No information
Replaces
State Code National Code Title Type
WC734 UEENEEN112A Install and maintain vital relay interlocking systems Unit of competency
Replaced By
State Code National Code Title Type
OFD89 UEERS0034 Maintain vital relay interlocking systems Unit of competency
State Code National Code Title Type
BFO2 UEE41220 Certificate IV in Electrical - Rail Signalling Qualification