Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and cut over metallic conductor cable to access network cabinet

Install and cut over metallic conductor cable to access network cabinet

Unit of competency
National Code
ICTCBL318
State Code
AWK39
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
18/01/2016
State Implementation and Classification
Approved Date
05/07/2016
Field of Education
031307 - Communications Technologies
Original Release Date
05/07/2016
Nominal Hours
35
Description
This unit describes the skills and knowledge required to install and cutover a new metallic conductor cable to an access network distribution cabinet. The cable types are typically up to 200 pair copper cables in the carrier access network. The cabinet types may be mixed mode bearer cabinets in the access network and cross connect units (CCUs) or pillars.It applies to linesworkers, field officers or technicians working for carriers, contractors or other service providers who install and rearrange copper cables in the carrier network.Work functions in the occupational areas where this unit may be used are subject to regulatory requirements. Refer to the Implementation Guide Companion Volume or the relevant regulator for specific guidance on requirements.
Notes
Elements and Performance Criteria
1. Prepare for installation
  • 1.1 Obtain relevant legislation, codes, regulations and standards for the job
  • 1.2 Obtain project plan to scope work and then obtain approval from client on key features of installation
  • 1.3 Arrange for site access to comply with landholder, government and statutory body regulations
  • 1.4 Inspect site to develop work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards
  • 1.5 Determine cable route and type of network cable equipment from project plan, taking into account the location of other services
  • 1.6 Obtain required plant, tools, safety equipment and materials for cabinet entry
  • 1.7 Coordinate with other parties to minimise disruption to services and down time
  • 1.8 Segregate incoming and outgoing cables to facilitate access and avoid overlaying and backtracking of cable
  • 1.9 Notify stakeholders of proposed cutover details and proposed disruption to services
  • 1.10 Undertake additional preparatory non-jointing work, as required, according to client practices and site conditions
2. Install required cable and termination modules
  • 2.1 Follow WHS and environmental requirements for given work
  • 2.2 Evaluate existing termination module type and capacity
  • 2.3 Install additional termination modules, if required, and modify existing housing capacity according to manufacturer’s specifications and industry practice
  • 2.4 Determine cable route between the parent jointing chamber and the cable termination blocks to comply with client practices, site limitations, equipment specifications and regulations
  • 2.5 Select entry port and sealing arrangements
  • 2.6 Install cable to cabinet
  • 2.7 Arrange and distribute cable fan out and routing according to industry practice
3. Joint, jumpering and cutover cable
  • 3.1 Joint cable according to jointing standards, materials, joint type, location, client practices and manufacturer’s guidelines
  • 3.2 Install jumpers and cut away tails to industry practice and to minimise service outages
  • 3.3 Test cable for performance and rectify any faults relating to cutover according to location, materials available and industry practice
  • 3.4 Seal all joints and cabinet according to cable type, location, client practices and manufacturer’s guidelines
4. Perform tests
  • 4.1 Visually check that all connections and interconnections are firm and sound
  • 4.2 Electrically test all terminations for continuity according to client practices
  • 4.3 Reseal and pressurise cables
5. Complete site restoration and project documentation
  • 5.1 Supply test results to the client for future reference
  • 5.2 Complete cut over report and design amendments report (As Built) to show final cable layout
  • 5.3 Recover obsolete materials and return to appropriate point for disposal
  • 5.4 Restore siteaccording to client practices or approving authority requirements
  • 5.5 Notify appropriate personnel about completion of cutover and obtain sign off
No information
No information
Replaced By
State Code National Code Title Type
OBA52 ICTCBL336 Install and cut over metallic conductor cable to access network cabinet Unit of competency