Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Drain work site

Drain work site

Unit of competency
National Code
CPCPDR2015A
State Code
D7426
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
11/10/2011
Field of Education
040327 - Plumbing
Original Release Date
11/10/2011
Nominal Hours
10
Description
This unit of competency specifies the outcomes required to remove water from a work site, either temporarily or permanently, through stormwater and sub-soil drainage systems. It includes the installation of submersible and non-submersible type pumps, suitable for pumping unscreened roof water, sub-soil water and surface water.
Notes
Elements and Performance Criteria
1. Prepare for work.
  • 1.1. Plans and specifications are obtained.
  • 1.2. Safety (OHS) requirements associated with draining a work site, and workplace environmental requirements, are adhered to throughout the work.
  • 1.3. Quality assurance requirements are identified and adhered to in accordance with workplace requirements.
  • 1.4. Tasks are planned and sequenced in conjunction with others involved in or affected by the work.
  • 1.5. Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
  • 1.6. Work area is prepared to support efficient draining of the work site.
2. Identify installation requirements.
  • 2.1. Proposed location of stormwater connection points, sumps, wells and pumps are determined from drawings and specifications.
  • 2.2. Quantity and type of materials and equipment required are calculated from design drawings and specifications and comply with standards and local authorities' requirements.
  • 2.3. Materials and equipment are identified, ordered and collected in accordance with workplace procedures.
  • 2.4. Materials and equipment are checked for compliance with docket and order form, and for acceptable condition.
3. Prepare and excavate site.
  • 3.1. Excavation site is set out to comply with drawings and specifications, installation and consideration for the location of existing services.
  • 3.2. Site is excavated in accordance with drawings and specifications, site requirements and standards, ensuring minimum damage to surrounding structures and environment.
  • 3.3. Sedimentation controls are constructed and positioned in accordance with specifications.
4. Install permanent drainage.
  • 4.1. Sumps and wells are constructed at specified levels and locations.
  • 4.2. Suction inlet point is prepared in accordance with drawings, specifications and manufacturers' requirements.
  • 4.3. Appropriate pumps are installed, in specified locations.
  • 4.4. Pipework and hoses are connected and fitted to pumps in accordance with drawings and specifications, manufacturers' requirements and site drainage specifications.
5. Operate drainage system.
  • 5.1. Pumps are activated to lower water level by specifications.
  • 5.2. Pump control system is adjusted to meet specification requirements.
  • 5.3. Pumps are maintained in accordance with manufacturer specifications and workplace requirements.
6. Clean up.
  • 6.1. Ground area is restored and work area is cleared, with materials disposed of or recycled in accordance with state or territory statutory and regulatory authority legislation.
  • 6.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and workplace procedures.
  • 6.3. Information is accessed and documentation completed in accordance with workplace requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Safety (OHS) is to be in accordance with commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
hazardous materials and substances
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
dangerous materials
dirt mounds
other machines
pits
plant and equipment
poles
recently filled trenches
site drainage tools
surrounding structure and facilities
traffic control
trees
trip hazards
underground services
uneven and unstable terrain
work site visitors and the public
working in proximity to others
use of firefighting equipment
use of first aid equipment
use of tools and equipment
workplace environment and safety.
Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.
Quality assurance requirements may include:
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.
Pumps:
may be:
sludge pumps
submersible
surface
vacuum
pump installation may be for temporary or permanent drainage.
Materials may include:
fittings and jointing
flexible pipes
polymer
other approved materials.
Statutory and regulatory authorities include:
state or territory statutory authority
statutory plumbing authority.
Tools and equipment include:
hand and power tools
manual and mechanical excavation equipment
measuring and levelling equipment
pumps
trench shoring equipment.
Information may include:
charts and hand drawings
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
regulatory and legislative requirements, particularly those pertaining to:
building codes
OHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to the drainage of work sites
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, standards and specifications to drain a work site
applying safety requirements throughout the work sequence, including the use of personal protective clothing and equipment
as a minimum the ability to, given the plans and specifications, drain water from a pit, trench or excavation containing water to a depth of at least half a metre, using a submersible pump; the site must remain effectively drained for the duration of the job, ensuring:
correct identification of location, design and details of proposed installation
correct selection and use of appropriate processes, tools and equipment
completing all work to specification
compliance with regulations, standards and organisational quality procedures and processes
communicating and working effectively and safely with others.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe working practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W9657 CPCPDR2005A Drain work site Unit of competency
Replaced By
State Code National Code Title Type
WF860 CPCPDR2025A Drain work site Unit of competency