Unit of competency Outline
Date retreived
22/07/2026 1:32 PM AWST
22/07/2026 1:32 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Specify and monitor the installation of monolithic/castable refractories
Specify and monitor the installation of monolithic/castable refractories
Unit of competency
National Code
PMC557095
PMC557095
State Code
BAH03
BAH03
TGA Status
Deleted
Deleted
DTWD Status
Transition (Deleted)
Transition (Deleted)
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030305 - Materials Engineering
Original Release Date
05/08/2016
Nominal Hours
35
Description
This unit of competency covers the skills and knowledge required to specify and monitor the installation of monolithic or castable refractories. It applies to castable, mouldable and gunned (shotcrete, gunite) refractories.This unit of competency applies to operators who are required to confirm that the design aligns to refractory requirements; design and document the installation method, materials, equipment and other specifications; and monitor the installation to ensure it meets specifications. This unit of competency applies to senior technicians or those in similar roles who are required to analyse and synthesise advanced theoretical and technical knowledge and apply independent judgement to high-level technical issues and complex problems. The individual may work in liaison with other refractory specialists or they may be the sole refractory specialist for this job or in their organisation.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Confirm design specification
- 1.1 Check design specification against agreed set of requirements for the refractory
- 1.2 Identify discrepancies or conflicts in requirements
- 1.3 Confirm installation requirements and specifications
2 Design installation process
- 2.1 Determine method of installing refractory
- 2.2 Determine refractory materials to be installed
- 2.3 Determine mix requirements for materials
- 2.4 Determine installation equipment requirements
- 2.5 Determine anchor requirements
- 2.6 Determine post placement requirements
- 2.7 Design formwork if required
- 2.8 Design scaffolding or other internal access needs if required
- 2.9 Design external access/egress means if required
- 2.10 Identify installation health, safety and environmental (HSE) hazards
- 2.11 Determine appropriate hazard controls
- 2.12 Check for discrepancies or conflicts in the designs and take appropriate action
3 Prepare for installation
- 3.1 Specify installation procedure
- 3.2 Liaise with relevant stakeholders
- 3.3 Modify specification if needed
- 3.4 Ensure correct ordering of requirements
- 3.5 Identify time critical items for the installation
- 3.6 Identify other items critical to the success of the project
- 3.7 Identify or develop measures to monitor all critical items
- 3.8 Prepare installation specification
4 Monitor installation
- 4.1 Ensure requirements meet specification/contract
- 4.2 Ensure hazard controls are in place and effective
- 4.3 Monitor work to installation specification
- 4.4 Take appropriate action on non-conformances as required
- 4.5 Report during project as required
- 4.6 Complete end of project documentation on completion
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WA981 | PMC557095A | Specify and monitor the installation of monolithic/castable refractories | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BCV0 | PMC80116 | Graduate Certificate In Refractories Engineering | Qualification |