Unit of competency Outline

Date retreived
22/07/2026 3:49 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct stone structures and features

Construct stone structures and features

Unit of competency
National Code
RTF3219A
State Code
S3301
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/04/2003
State Implementation and Classification
Approved Date
04/03/2004
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
04/03/2004
Nominal Hours
30
Description
Notes
Elements and Performance Criteria
No information
The Range of Variables explains the contexts within which the performance and knowledge requirements of this standard may be assessed. The scope of variables chosen in training and assessment requirements may depend on the work situations available.

What tools and equipment are likely to be used when constructing concrete structures and features?
Tools and equipment may include levelling equipment, string lines, tape measures, spades, shovels, trowels, wheelbarrow and concrete mixer.

What OHS hazards apply to this standard?
OHS hazards may include manual lifting, use of power tools, use of sharp hand tools, dust, and sun exposure.

What OHS controls may be relevant to this standard?
OHS controls may include safe lifting and transporting techniques, the drinking of fluids, basic first aid, and the appropriate use of personal protective clothing and equipment such as overalls, boots, hat, gloves, the erection of safety signs and barriers, the identification of site access points, and the safe storage of materials on site.

What environmental implications are likely to be considered?
Consideration may be given to the impact of soil disturbance and the alteration to water flow during construction and after the structure or feature has been constructed.

What services are likely to be located on site?
Services may include power, gas, water, stormwater, sewerage or septic connections, phone and optical cables.

What drainage systems are likely to be installed?
Drainage systems may include sumps, agricultural drains, storm water pipes, slotted pipes, open drains and channels.

What evidence is required to demonstrate competence for this standard as a whole?Competence in constructing stone structures and features requires evidence that work can be planned and prepared, that the construction site can be set out and prepared according to design drawings and specifications, and that the structure or feature can be constructed according to the required standards.The skills and knowledge required to construct stone structures and features must be transferable to a different work environment. For example, a person should be able to apply the same principles of stone work construction whether they are laying a path, building a barbeque, or installing a retaining wall.
What specific knowledge is needed to achieve the performance criteria?

Knowledge and understanding are essential to apply this standard in the workplace, to transfer the skills to other contexts, and to deal with unplanned events. The knowledge requirements for this competency standard are listed below:

comparative environmental implications associated with soil disturbance and the establishment of drainage systems
components of mortar including admixes such as bonding and colouring agents used in the construction of stone structures and features.

What specific skills are needed to achieve the performance criteria?

To achieve the performance criteria, appropriate literacy and numeracy levels as well as some complementary skills are required. These include the ability to:

interpret design drawings and specifications and transpose the information to site
measure and construct profiles using mathematical techniques
use levelling equipment.

What processes should be applied to this competency standard?There are a number of processes that are learnt throughout work and life, which are required in all jobs. They are fundamental processes and generally transferable to other work functions. Some of these are covered by the key competencies, although others may be added. The questions below highlight how these processes are applied in this competency standard. Following each question a number in brackets indicates the level to which the key competency needs to be demonstrated where 0 = not required, 1 = perform the process, 2 = perform and administer the process and 3 = perform, administer and design the process.
Communicating ideas and information
Information regarding the type of bonding agent to be used may need to be communicated to other members of the work team. (2)

Collecting analysing and organising information
Information from design drawings and specifications may need to be collected, analysed and then organised to transpose it on to site. (2)

Planning and organising activities
Activities may need to be planned and organised to meet timelines, and to finish the project according to budget. (2)

Working with others and in teams
Team work may need to be applied when setting out and preparing a site for construction. (2)

Using mathematical ideas and techniques
Mathematical ideas and techniques may be applied when calculating quantities of materials required. (2)

Solving problems
Problem-solving skills may be applied if the mortar is mixed to the incorrect consistency. (2)

Using technology
The use of technology may be applied when marking out the site for construction. (2)

Replaced By
State Code National Code Title Type
D6919 AHCLSC305A Construct stone structures and features Unit of competency
State Code National Code Title Type
S342 RTF30103 Certificate III in Horticulture Qualification
S345 RTF30403 Certificate III in Horticulture (Landscape) Qualification