Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and finalise works projects
Monitor and finalise works projects
Unit of competency
National Code
LGAWORK601A
LGAWORK601A
State Code
C7848
C7848
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
15/08/2014
Field of Education
080315 - Project Management
Original Release Date
15/08/2014
Nominal Hours
80
Description
This unit covers monitoring a works project site and project services to finalise the project.
Notes
Elements and Performance Criteria
1 Undertake ongoing works/project supervision
- 1.1 Regular inspection of works /project is undertaken to ensure compliance with design, specifications and the program for completion.
- 1.2 Regular planned meetings are held and documented between all works/project personnel to ensure problems are identified and resolved early.
- 1.3 Testing of works in progress is carried out in accordance with legislation, regulations and policy requirements.
- 1.4 Measures are taken during works progress to maximise the occupational health and safety (OHS) of site personnel and visitors.
- 1.5 Consistent and accurate records of works progress are recorded and maintained.
2 Monitor project costs
- 2.1 Project costs are monitored on a regular basis to ensure that the work is carried out within financial constraints.
- 2.2 Progressive payments for works completed are authorised after inspection against tender, quotation or submission details.
3 Update working drawings and the assets management system
- 3.1 Variations between construction and design are progressively identified and official project drawings are updated and filed.
- 3.2 Authorisations for variations between construction and design are obtained and relevant personnel are notified without delay.
- 3.3 Project assets are recorded to update the assets management system.
- 3.4 Ongoing asset maintenance requirements are recorded in the assets register.
- 3.5 The assets management system is kept up to date.
4 Inspect final works
- 4.1 Works are certified following inspection as required by legislation, regulations or council policies.
- 4.2 Works completion is authorised in writing after inspection to confirm works have been completed and constructed to design objectives and specifications.
- 4.3 Post-defect, maintenance period and final inspections are undertaken.
- 4.4 Final acceptance notifications are issued.
- 4.5 Securities and retention bonds are returned where required.
5 Organise a post-construction briefing
- 5.1 Communication with design and construction staff to evaluate the project works is undertaken.
- 5.2 Suggested design improvements for future projects are documented.
6 Prepare report to council
- 6.1 An appraisal pro-forma is prepared that outlines contractors' compliance with OHS, quality and timing of work, claims for extras and overall management to assist in future evaluation and selection of tenders.
- 6.2 An accurate and objective report on works/project is prepared for council to enable informed decision making to occur.
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.
Works may include:
day labour
contracts or a combination of hired plant
resource sharing
subcontractors and day labour
Project scheduling may include:
time lines
critical path analysis
Works may include:
day labour
contracts or a combination of hired plant
resource sharing
subcontractors and day labour
Project scheduling may include:
time lines
critical path analysis
Overview of assessment requirements
A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.
Critical aspects of evidence to be considered
Knowledge of full project activities is demonstrated.
Resource availability and time frames are adhered to and there is ongoing supervision and inspection of activities.
A post-construction briefing is held.
Context of assessment
May be assessed through:
on the job
simulated workplace environment
written assignment
short-answer test
oral questioning
observation
or any combination of the above
Relationship to other units(prerequisite or co-requisite units)
To enable holistic assessment this unit may be assessed with other units that form part of the job role.
Method of assessment
The following assessment methods are suggested:
observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies
written and/or oral questioning to assess knowledge and understanding
completion of workplace documentation
third-party reports from experienced practitioners
completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor
Evidence required for demonstration of consistent performance
Evidence will need to be gathered over time across a range of variables.
Resource implications
In accordance with a range of variable requirements.
A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.
Critical aspects of evidence to be considered
Knowledge of full project activities is demonstrated.
Resource availability and time frames are adhered to and there is ongoing supervision and inspection of activities.
A post-construction briefing is held.
Context of assessment
May be assessed through:
on the job
simulated workplace environment
written assignment
short-answer test
oral questioning
observation
or any combination of the above
Relationship to other units(prerequisite or co-requisite units)
To enable holistic assessment this unit may be assessed with other units that form part of the job role.
Method of assessment
The following assessment methods are suggested:
observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies
written and/or oral questioning to assess knowledge and understanding
completion of workplace documentation
third-party reports from experienced practitioners
completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor
Evidence required for demonstration of consistent performance
Evidence will need to be gathered over time across a range of variables.
Resource implications
In accordance with a range of variable requirements.
No information