Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply construction principles to civil engineering works

Apply construction principles to civil engineering works

Unit of competency
National Code
NWP555
State Code
WD476
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
030901 - Construction Engineering
Original Release Date
06/11/2014
Nominal Hours
45
Description
This unit of competency sets out the knowledge and skills required to apply the fundamental principles and concepts associated with planning, estimating and costing to the preparation and interpretation of tender documents, costs estimates and the reporting of actual versus estimated project costs. This includes the documenting of people, plant, equipment and processes employed in the water industry.
Notes
Elements and Performance Criteria
1 Develop planning, estimating, costing and construction principles of a civil engineering construction project
  • 1.1 Obtain and implement OHS and environmental requirements for the work area.
  • 1.2 Identify planning, estimating, costing and construction principles of a from documentation, work requests or discussions with appropriate personnel.
  • 1.3 Identify construction project material from documents, work requests or discussions with appropriate personnel.
  • 1.4 Evaluate design references to complete the planning, estimating, costing and construction principles in accordance with enterprise procedures.
  • 1.5 Obtain resources and equipment needed for the task and check for correct operation in accordance with enterprise procedures.
  • 1.6 Appropriate personnel are consulted to ensure the work is co-ordinated effectively with others involved at the work site.
2 Complete planning, estimating, costing and develop construction principles of a civil engineering project
  • 3.1 Complete planning, estimating, costing and construction principles in accordance with enterprise procedures.
  • 3.2 Use design references according to manufacturer’s manuals and enterprise procedures.
  • 3.3 Record, analyse and apply outcomes according to enterprise procedures.
  • 3.4 Select methods for dealing with unexpected situations on the basis of discussions with appropriate personnel, job specifications and enterprise procedures.
3 Compile, document and present results
  • 4.1 Record, analyse and report results in accordance with initial brief and enterprise procedures.
  • 4.2 Maintain and store design references in accordance with enterprise procedures.
  • 4.3 Store and archive results according to enterprise procedures.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Environmental requirements may include:
control of gas, fume, vapour, smoke emissions, including fugitive emissions
management of liquid waste
management of solid waste
control of excessive energy and water use
control of excessive noise
Appropriate personnel may include:
supervisor
colleague
foreman
team leader
supervising engineer
teacher
Enterprise procedures may include:
the use of tools and equipment
instructions, including job sheets, cutting lists, plans, drawings and designs
reporting and communication
manufacturers' specifications and operational procedures
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to:
plan, estimate, cost and develop construction principles of a civil engineering project on more than one occasion and in different contexts
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
workplace specific equipment and technology
supervision and experienced team members to provide observations, feedback and third party reports
enterprise operating procedures and work allocation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence require that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person’s competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the candidate, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.