Unit of competency Outline
Information current as of
21/10/2026 9:52 PM AWST
21/10/2026 9:52 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Assist with basic earth shaping for nutrient capture and storage
Assist with basic earth shaping for nutrient capture and storage
Unit of competency
National Code
AHCPER213
AHCPER213
State Code
BAQ33
BAQ33
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
12/01/2017
Original Release Date
27/06/2016
Nominal Hours
25
Field of Education
059999 - Agriculture, Environmental And Related Studies, N.e.c.
Description
This unit of competency describes the skills and knowledge required to assist with basic earth shaping for nutrient capture and storage in a permaculture system. It requires knowledge of permaculture earthworks used for nutrient capture and storage, behaviour of water in the natural environment, reading the landscape, working with slopes and contours and digging techniques, both manual and mechanical.All work is carried out to comply with workplace procedures.This unit applies to individuals who work under general supervision and exercise limited autonomy with some accountability for their own work. They undertake defined activities and work in a structured context.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1. Assess and measure slope using simple tools
- 1.1 Identify issues with slope such as erosion gullies, plant growth, water pooling
- 1.2 Use a plumb bob and 3-4-5 triangle or similar to calculate fall
- 1.3 Record slope profile and fall in several places across a wide slope
2. Peg out contours
- 2.1 Step an A frame across the slope to find and peg the contour
- 2.2 Use an A-frame and water level to check contour pegging
- 2.3 Label or flag contour pegs to avoid confusion
3. Prepare to shape earth
- 3.1 Select tools and equipment for earth shaping work
- 3.2 Hire small machinery if necessary or if the job is a big one
- 3.3 Hire a contractor if the job demands and follow any legislative requirements
- 3.4 Check weather forecasts and condition of soil before digging
4. Shape earth for nutrient capture and storage
- 4.1 Use manual or mechanical digging system to shape the earth
- 4.2 Avoid damage to underground structures, services, roots of trees and building foundations
- 4.3 Follow the design requirements and clarify any anomalies
5. Test earth shaping work
- 5.1 Confirm that earth shaping holds water (or drains, as required)
- 5.2 Confirm that earth shaping of berms, swales or terraces will not erode or pool water
- 5.3 Rake, sweep or compact to even any discrepancies
- 5.4 Test earth shaped structure by watering or opening valves and adjust as required
6. Complete earth shaping work
- 6.1 Line earth shaped swales or ponds according to design
- 6.2 Plant contour banks or terraces according to design
- 6.3 Mulch any exposed soil or surfaces or fill, depending on climate and permaculture design requirements
- 6.4 Clean up any surplus or waste materials from the earth shaping work in an environmentally safe manner
- 6.5 Return tools, equipment and storable materials to storage
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| BDD2 | AHC21716 | Certificate II in Permaculture | Qualification |