Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Repair vehicle plant, tools, equipment and systems
Repair vehicle plant, tools, equipment and systems
Unit of competency
National Code
AUMATK009
AUMATK009
State Code
WH917
WH917
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
11/03/2014
Original Release Date
10/01/2014
Nominal Hours
40
Field of Education
030705 - Toolmaking
Description
This unit describes the performance outcomes required to repair plant, tools, equipment and systems used in the design, development and production of motor vehicles.It applies to those in an automotive manufacturing environment.No licensing, legislative or certification requirements apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1. Identify faulty plant, tools, equipment and systems
- 1.1 Reported defects of plant, tool, equipment or system are investigated and faults identified
- 1.2 Repair instructions and plans are interpreted to identify required processes and materials
- 1.3 Plant, tool, equipment or system is inspected and operated to confirm nature of reported fault
- 1.4 Repair plan is developed with production and maintenance personnel
2. Remove faulty plant, tools, equipment and systems
- 2.1 Identified faulty plant, tool, equipment or system is removed according to the repair plan and in line with workplace procedures
- 2.2 Where required, faulty plant, tool, equipment or system is temporarily replaced
3. Diagnose faults
- 3.1 Faults are located, causes identified, and repair strategy is developed that addresses fault-rectification requirements
- 3.2 Information from maintenance records, test results and fault diagnosis guides is used to assist in fault identification
- 3.3 Specialist advice is obtained, where required, to confirm rectification strategy
4. Repair faults
- 4.1 Faulty plant, tool, equipment or system is dismantled according to the repair strategy
- 4.2 Component parts are assessed and repair strategy is developed according to workplace procedures
- 4.3 Component parts are repaired, modified or replaced
- 4.4 Parts requiring specialist repair are tagged and repair instructions documented according to workplace procedures
- 4.5 Repaired plant, tools and equipment are re-assembled
5. Re-install plant, tools, equipment and systems
- 5.1 Re-installation plan for plant, tool, equipment or system is confirmed with relevant personnel
- 5.2 New or repaired plant, tool, equipment or system is re-installed and checked for compliance and correct operation
6. Calibrate and adjust plant, equipment and systems
- 6.1 New or repaired plant, tool, equipment or system is calibrated, adjusted and tested
- 6.2 Details of the repair, re-commissioning, testing and serviceability are documented according to workplace procedures