Unit of competency Outline
Date retreived
23/07/2026 6:44 AM AWST
23/07/2026 6:44 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Implement and monitor a property improvement plan
Implement and monitor a property improvement plan
Unit of competency
National Code
AHCAGB401A
AHCAGB401A
State Code
D6635
D6635
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
24/06/2014
Field of Education
080321 - Farm Management And Agribusiness
Original Release Date
24/06/2014
Nominal Hours
40
Description
This unit covers the implementation and monitoring of a property improvement plan and defines the standard required to: consider the environmental impacts of property improvements; plan and implement the construction of physical resources; organise and schedule the maintenance of physical resources; and analyse and assess the costs and benefits of plans and layouts in the light of all considerations Occupational Health and Safety (OHS), financial, environmental and animal welfare; prepare plans and procedures for implementation by others.
Notes
Elements and Performance Criteria
1. Agree on the improvement to be carried out
- 1.1. Specific improvements for the planning period are discussed with the relevant people and agreements are made.
- 1.2. Plans are made, and schedules amended, to construct and maintain the improvements in line with property management plans.
- 1.3. Allocations are made from the available budget for the planned improvements.
2. Arrange the design and layout of the property improvements
- 2.1. Alternative plans and layouts are assessed and selected based on how appropriate they are for the management plan, and environmental and OHS considerations.
- 2.2. Plans for the improvements are drawn and dimensions are calculated for the agreed improvements.
3. Order materials for property improvements
- 3.1. Materials required for the construction of the improvements are calculated from the drawn plans and discussed with relevant colleagues.
- 3.2. Quotes are obtained from suppliers for the materials and suitable suppliers are selected.
- 3.3. Orders are placed with the chosen suppliers for the quantities, sizes and types of materials required.
4. Prepare sites for installation
- 4.1. Sites are inspected, key features noted, and suitable sites are chosen for the planned property improvements.
- 4.2. All relevant people, including neighbours, are informed of the proposed activities where this is appropriate and/or necessary.
- 4.3. Selected sites are measured and pegged according to the prepared plans.
- 4.4. The site is prepared to be ready for construction, and precautions are taken to ensure that potential negative environmental impacts are minimised or eliminated.
- 4.5. OHS hazards are identified and assessed, and responsible action taken throughout the site preparation activities.
5. Supervise installation and operation of property improvements
- 5.1. All materials required for each work period are obtained, organised, and on site ready for construction.
- 5.2. Installation of property improvements is started according to the drawn plans and the prepared schedules.
- 5.3. All installation works are undertaken in a manner that ensures that potential negative environmental impacts are minimised or eliminated.
- 5.4. OHS hazards are identified and assessed, and responsible action taken throughout the installation works.
- 5.5. Communication is maintained between those working at the site and others.
- 5.6. The installation works are regularly checked to ensure consistency with the drawn plans, and environmental and OHS requirements.
- 5.7. Any waste material or substances are disposed of in full consideration of environmental implications.
- 5.8. Where corrective action is required, it is initiated and taken.
6. Carry out and monitor planned maintenance
- 6.1. Planned maintenance to the improvements is carried out and monitored according to the guidelines and standards of the property.
- 6.2. Precautions are taken throughout the maintenance works to ensure that potential negative environmental impacts are minimised or eliminated.
- 6.3. OHS hazards are identified, assessed, monitored and responsible action taken throughout the maintenance works.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Physical assets in property improvement plans may include:
buildings
dairy sheds
shelters
stock yards
stock handling structures
fences
water supply systems
roads and tracks
soil conservation works
irrigation and drainage channels
silage pits and/or grain and fodder storage.
The range statement relates to the unit of competency as a whole.
Physical assets in property improvement plans may include:
buildings
dairy sheds
shelters
stock yards
stock handling structures
fences
water supply systems
roads and tracks
soil conservation works
irrigation and drainage channels
silage pits and/or grain and fodder storage.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
consider the environmental impacts of property improvements
plan and implement the construction of physical resources
organise and schedule the maintenance of physical resources
analyse and assess the costs and benefits of plans and layouts in the light of all considerations - OHS, financial, environmental and animal welfare
prepare plans and procedures for implementation by others.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
consider the environmental impacts of property improvements
plan and implement the construction of physical resources
organise and schedule the maintenance of physical resources
analyse and assess the costs and benefits of plans and layouts in the light of all considerations - OHS, financial, environmental and animal welfare
prepare plans and procedures for implementation by others.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S3514 | RTE4203A | Implement and monitor a property improvement plan | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAO06 | AHCAGB401 | Plan and implement property improvement | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D509 | AHC41010 | Certificate IV in Agribusiness | Qualification |
| D500 | AHC40110 | Certificate IV in Agriculture | Qualification |
| J274 | AHC41612 | Certificate IV in Organic Farming | Qualification |
| J272 | AHC41412 | Certificate IV in Seed Production | Qualification |