Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Co-ordinate and implement dry end shutdown

Co-ordinate and implement dry end shutdown

Unit of competency
National Code
FPPDEO5A
State Code
AYD71
TGA Status
Replaced
DTWD Status
Archived
Current Release Number
1.00
Current Release Date
01/12/2001
State Implementation and Classification
Approved Date
Field of Education
030101 - Manufacturing Engineering
Original Release Date
Nominal Hours
0
Description
Notes
Elements and Performance Criteria
No information
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

drying processes
reeling operations
chemical additive system
monitoring systems
sheet treatment processes
tail feed systems
broke system
on-line coating systems
calendering systems

chemicals
compressed air
water
electricity/gas
steam
additives
felts/fabrics
machine clothing
dry screens
ropes

equipment appropriate to the dry end processes
hand and power tools

OH&S
environmental
statutory legislation
enterprise policies and procedures
Standard Operating Procedures (SOP)
quality assurance

SOP
grade specifications
maintenance logs
job sheets
operating log
production instructions
Materials Safety Data Sheets (MSDS)
process and instrument diagrams

as per site agreement
operator maintenance schedules
maintenance systems

computer systems
electronic screens and alarms
process control systems (analogue/digital)

team members
production/services co-ordinators
internal/external suppliers and customers
maintenance services

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Describes types and causes of shutdowns.
Explains routines, procedures, and safety related to shutdowns.
Explains effects of shutdowns to the rest of the systems.
Explains isolations and lockouts and the procedures for implementing them.
Describes problem-solving techniques.
Describes the procedures involved with emergency and planned shutdown conditions.
Uses effective communication and observation skills.
Explains logging and recording of information requirements.
Demonstrates ability to handle dry end shutdown.
Responds to shut situations promptly and according to enterprise procedures.
Implements personnel protection and plant security priorities according to Standard Operating Procedures (SOP).
Works within OH&S, SOP, environmental and safe working requirements and practices.

Replaced By
State Code National Code Title Type
AUY04 FPPDEO330A Co-ordinate and implement dry end shutdown Unit of competency
No information