Unit of competency Outline
Date retreived
22/07/2026 6:06 PM AWST
22/07/2026 6:06 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Select and use small plant and equipment for demolition tasks
Select and use small plant and equipment for demolition tasks
Unit of competency
National Code
CPCCDE3018A
CPCCDE3018A
State Code
WI744
WI744
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
20/06/2014
Nominal Hours
30
Description
This unit of competency specifies the outcomes required to select and use small plant and equipment safely and effectively to complete individual demolition tasks, such as breaking concrete, stripping out interior of buildings, pulling down walls and separating waste for recycling.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions are obtained using relevant information, confirmed with colleagues or supervisor, and applied to planning and preparation.
- 1.2 Work health and safety (WHS) requirements are identified and applied to task planning according to safety plans and policies and work site requirements.
- 1.3 Environmental requirements are identified and applied according to environmental plans and regulatory obligations.
2 Identify and check small plant and equipment.
- 2.1 Small plant and equipment to be used in the demolition process are identified and checked for serviceability, and faults are rectified and reported.
- 2.2 Functions and methods of operation of demolition small plant and equipment are identified from specifications, standards and manufacturer instructions.
- 2.3 Specific WHS requirements for the selected small plant and equipment are identified and applied.
3 Complete demolition tasks.
- 3.1 Confirmation is obtained from supervisor and regulatory authorities that existing services have been disconnected.
- 3.2 Work site inspection is conducted and hazards associated with individual demolition tasks are assessed immediately prior to commencing work according to workplace procedures.
- 3.3 Safe demolition work method is amended if required and confirmed with colleagues or supervisor.
- 3.4 Work area is prepared for the use of demolition small plant and equipment.
- 3.5 Small plant and equipment that meet the requirements of the demolition task are selected.
- 3.6 Pre-operational checks are completed according to manufacturer recommendations.
- 3.7 Small plant and equipment are used for their intended purpose in demolition tasks according to regulations, standards, codes of practice and workplace requirements.
- 3.8 Work progress and hazards or issues arising during work tasks are communicated with work team according to workplace requirements.
- 3.9 Small plant and equipment are placed in safe locations when not in immediate use.
4 Clean up.
- 4.1 Work area is cleared and materials are sorted for reuse or recycling and removed, and waste is disposed of using safe manual handling techniques and according to workplace procedures, regulations, codes of practice and job specifications.
- 4.2 Small plant and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information may include:
advice and guidelines relating to regulatory and legislative requirements for using demolition tools and equipment
current Australian standards relating to using small plant and equipment for demolition tasks
diagrams or sketches
instructions issued by authorised organisational or external personnel
job safety analyses (JSA)
memos
plans, drawings and specifications
procedures relating to the use of demolition plant and equipment
quality requirements relating to the use of demolition tools and equipment
safe work method statements (SWMS)
safety data sheets (SDS)
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Work health and safety requirements must comply with state or territory legislation and regulations and demolition project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
manual handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
identification of hazardous materials and substances and relevant safe handling or quarantining procedures for each, including:
animal residue
asbestos
dust
lead
lead-based paints
pesticide residue
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
use of safe operating procedures, including operational risk assessment and treatments associated with:
equipment tagging
fall protection
identification and preparation of access and egress points
identification of equipment guarding and cut-off switches
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others.
Environmental requirements may include:
management of:
clean-up
dust
energy use
noise
vibration
waste
water use
sedimentation control
stormwater quality.
Small plant and equipment may include:
small plant, such as:
air compressors
elevated work platforms (EWPs)
forklifts
generators
jackhammers
material and personnel hoists
mini-loaders
pumps
rubber-tyred loaders
equipment, such as:
brooms
safety equipment, including:
barricades
fall prevention
PPE
scaffolds
signs
pallet trolleys
wheelbarrows.
Hazards associated with individual demolition tasks may include:
hazards identified in project demolition plan
unpredicted hazards uncovered as a result of prior work completed on site, such as:
buried asbestos waste
fire damage
termite damage
undocumented new or relocated services, including electrical wiring.
Preparation of work areas may include:
communicating with those who may be affected by the demolition task
erecting scaffolding and dust protection
identifying positions of hoses and cables clear of hazards
installing supports and bracing
location of signage and barricades
provision for site safety.
Demolition tasks:
must include:
breaking concrete
dismantling warehouse purlins and wall or roof sheeting
loading trucks
pulling down walls
removing wall and floor toppings
separating waste for recycling
stripping out interiors of buildings
may be performed:
at ground level
at heights
in confined spaces
on new construction sites
on existing structures being removed, renovated or extended, which involves the complete or partial removal of components
over water
under water
underground.
Pre-operational checks may include:
hydraulic fluid
levels of lubricants
water.
Communication with work team may include:
non-verbal communication, including immediate stop work flags or notices in the case of uncovered hazards that must be re-assessed
verbal communication
use of technological equipment.
Information may include:
advice and guidelines relating to regulatory and legislative requirements for using demolition tools and equipment
current Australian standards relating to using small plant and equipment for demolition tasks
diagrams or sketches
instructions issued by authorised organisational or external personnel
job safety analyses (JSA)
memos
plans, drawings and specifications
procedures relating to the use of demolition plant and equipment
quality requirements relating to the use of demolition tools and equipment
safe work method statements (SWMS)
safety data sheets (SDS)
signage
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Work health and safety requirements must comply with state or territory legislation and regulations and demolition project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
manual handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
identification of hazardous materials and substances and relevant safe handling or quarantining procedures for each, including:
animal residue
asbestos
dust
lead
lead-based paints
pesticide residue
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
use of safe operating procedures, including operational risk assessment and treatments associated with:
equipment tagging
fall protection
identification and preparation of access and egress points
identification of equipment guarding and cut-off switches
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others.
Environmental requirements may include:
management of:
clean-up
dust
energy use
noise
vibration
waste
water use
sedimentation control
stormwater quality.
Small plant and equipment may include:
small plant, such as:
air compressors
elevated work platforms (EWPs)
forklifts
generators
jackhammers
material and personnel hoists
mini-loaders
pumps
rubber-tyred loaders
equipment, such as:
brooms
safety equipment, including:
barricades
fall prevention
PPE
scaffolds
signs
pallet trolleys
wheelbarrows.
Hazards associated with individual demolition tasks may include:
hazards identified in project demolition plan
unpredicted hazards uncovered as a result of prior work completed on site, such as:
buried asbestos waste
fire damage
termite damage
undocumented new or relocated services, including electrical wiring.
Preparation of work areas may include:
communicating with those who may be affected by the demolition task
erecting scaffolding and dust protection
identifying positions of hoses and cables clear of hazards
installing supports and bracing
location of signage and barricades
provision for site safety.
Demolition tasks:
must include:
breaking concrete
dismantling warehouse purlins and wall or roof sheeting
loading trucks
pulling down walls
removing wall and floor toppings
separating waste for recycling
stripping out interiors of buildings
may be performed:
at ground level
at heights
in confined spaces
on new construction sites
on existing structures being removed, renovated or extended, which involves the complete or partial removal of components
over water
under water
underground.
Pre-operational checks may include:
hydraulic fluid
levels of lubricants
water.
Communication with work team may include:
non-verbal communication, including immediate stop work flags or notices in the case of uncovered hazards that must be re-assessed
verbal communication
use of technological equipment.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace by observation of the selection and use of small plant and equipment, and completion of on-site demolition tasks as part of a team.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
complete five different types of on-site demolition tasks safely and effectively, using appropriate combinations of small plant and equipment, to perform at least one of each of the following tasks:
breaking concrete
dismantling warehouse purlins and wall or roof sheeting
loading trucks
pulling down walls
removing wall and floor toppings
separating waste for recycling
stripping out interiors of buildings
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and requirements of WHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
communicate and work effectively and safely with others
follow work instructions, operating procedures and inspection practices to safely and effectively use demolition tools and equipment for their appropriate application, ensuring:
there is no damage to small plant or equipment
work is completed to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
information relevant to each task, such as safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed in the workplace by observation of the selection and use of small plant and equipment, and completion of on-site demolition tasks as part of a team.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
complete five different types of on-site demolition tasks safely and effectively, using appropriate combinations of small plant and equipment, to perform at least one of each of the following tasks:
breaking concrete
dismantling warehouse purlins and wall or roof sheeting
loading trucks
pulling down walls
removing wall and floor toppings
separating waste for recycling
stripping out interiors of buildings
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and requirements of WHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
communicate and work effectively and safely with others
follow work instructions, operating procedures and inspection practices to safely and effectively use demolition tools and equipment for their appropriate application, ensuring:
there is no damage to small plant or equipment
work is completed to specification
compliance with regulations, standards and organisational quality procedures and processes.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
information relevant to each task, such as safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM54 | CPCCDE3018 | Select and use small plant and equipment for demolition tasks | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J785 | CPC30413 | Certificate III in Demolition | Qualification |